Inspections for the day of: Friday, April 1, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00869 General Inspection4/1/20114/1/20114/1/2011 4:09:25 PM PASS
ESC11-00027 Site Preparation3/30/20114/1/20114/1/2011 2:54:51 PMADONE
Confrence with RP:
Went over the scope of work and area of disurbance. Recommend that delinating the disturbed area work be a considible BMP to keep the area of disturbance under an acre due to the proposed are being .88 acres. Also to use approved inlet protection within the storm drain inlet protection instead of filter fabric. Will follow up with a site prep on 4/6/2011AM
ESC10-00040 Complaint Inspection4/1/20114/1/20114/1/2011 2:49:13 PMPFAIL
Message to RP & Verbal to Project Manager:
Correction Notice:
Clean up all sediment and debris off of all hard surfaces surrounding the project area. Failure to comply by 4/1/2011PM will result in a Stop Work Order. Will re-inspect on 4/4/2011am.
ESC11-00047 Site Preparation2/23/20114/1/20114/1/2011 1:39:01 PMANR
ESC10-00487 General Inspection4/1/20114/1/20114/1/2011 1:38:15 PM DONE
Permit finalled.
ESC10-00487 DOC - Permit Finaled4/1/20114/1/20114/1/2011 1:36:51 PMPPASS
ESC10-00498 General Inspection4/1/20114/1/20114/1/2011 1:23:37 PM PASS
ESC11-00055 General Inspection4/1/20114/1/20114/1/2011 1:04:53 PM PASS
ESC10-00849 General Inspection4/1/20114/1/20114/1/2011 1:03:30 PM PASS
ESC11-00129 Site Preparation4/1/20114/1/20114/1/2011 1:03:10 PM FAIL
Verbal correction notice to RP:
Removal all sediment form the stockpile off of the sidewalk. Install a sediment barrier alonig the bsck of sidewalk. Will re-inspect on 4/4/2011
ESC10-00531 General Inspection4/1/20114/1/20114/1/2011 10:29:12 AM PASS