BLD08-00207
| BLD-Conference | 4/1/2013 | 4/1/2013 | 4/2/2013 10:28:24 AM | P | DEFR |
|
|
|
BLD13-00434
| BLD-Footing | 3/29/2013 | 4/1/2013 | 4/1/2013 4:46:26 PM | P | PASS |
|
|
dane Phone #: ###-####
|
BLD13-00133
| BLD-Framing/Rough-in | 4/1/2013 | 4/1/2013 | 4/1/2013 3:47:49 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
BLD12-03094
| BLD-Foundation | 4/1/2013 | 4/1/2013 | 4/1/2013 2:59:53 PM | P | PART |
|
|
jim Phone #: ###-#### placed with s/i ok
|
BLD13-00612
| BLD-Other | 3/29/2013 | 4/1/2013 | 4/1/2013 2:51:17 PM | P | PASS |
|
|
rebar - steve Phone #: ###-#### pending ele
|
BLD13-00261
| BLD-Footing | 4/1/2013 | 4/1/2013 | 4/1/2013 1:55:38 PM | P | PASS |
|
|
Alvaro Phone #: ###-####
|
BLD12-03273
| BLD-Other | 3/29/2013 | 4/1/2013 | 4/1/2013 10:13:30 AM | A | PART |
|
|
post tension cable insp//James Phone #: ###-#### work ok to proceed e mail with engineer ok as well as elonggations discused w/si on site.
|
BLD13-00278
| BLD-Conference | 3/31/2013 | 4/1/2013 | 4/1/2013 10:11:22 AM | A | DONE |
|
|
Roof is all done thank you Phone #: ###-#### >> Inspection requested via web by Sandra Daffer
|
BLD13-00278
| DOC - Permit Finaled | 4/1/2013 | 4/1/2013 | 4/1/2013 10:10:58 AM | P | PASS |
|
|
|
BLD13-00278
| BLD-Final | 4/1/2013 | 4/1/2013 | 4/1/2013 10:10:43 AM | A | PASS |
|
|
Roof is all done thank you Phone #: ###-#### >> Inspection requested via web by Sandra Daffer
|
BLD12-03178
| BLD-Framing/Rough-in | 3/28/2013 | 4/1/2013 | 4/1/2013 8:57:20 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall fire blk fur out in garage// duct seal. ok to insulate
|
BLD12-03176
| BLD-Energy code compliance | 3/28/2013 | 4/1/2013 | 4/1/2013 8:55:31 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|