BLD13-00137
| BLD-Final | 3/29/2013 | 4/1/2013 | 4/2/2013 1:39:02 PM | P | NR |
|
|
chad Phone #: ###-#### Left v/m.....Need all other permits and fire finals.
|
BLD13-00214
| BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 5:03:14 PM | P | PASS |
|
|
steve Phone #: ###-#### Called Steve.....Do not cover without Mech. rough-in approval.
|
BLD13-00273
| BLD-Energy code compliance | 4/1/2013 | 4/1/2013 | 4/1/2013 3:01:22 PM | P | PASS |
|
|
paul Phone #: ###-####
|
GCB12-00168
| GCB-Final | 4/1/2013 | 4/1/2013 | 4/1/2013 3:00:12 PM | P | PASS |
|
|
Joe @ ###-#### Call in advance Unable to determine if all required finals are complete. Structural final only.........OK.
|
BLD13-00562
| BLD-Footing | 4/1/2013 | 4/1/2013 | 4/1/2013 2:09:22 PM | P | PASS |
|
|
Ryan Phone #: ###-####
|
BLD12-03191
| BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 1:21:55 PM | A | PASS |
|
|
Shear wall and roof nailing Phone #: ###-#### >> Inspection requested via web by Kent Olsen
|
BLD12-03131
| BLD-Framing/Rough-in | 3/29/2013 | 4/1/2013 | 4/1/2013 1:18:12 PM | A | PART |
|
|
ryan Phone #: ###-#### Framing pass No sticker for Mech rough-in.......Called Ryan....
|
MIS13-00070
| BLD-Conference | 3/26/2013 | 4/1/2013 | 3/27/2013 12:00:00 AM | A | DONE |
|
|
Nate phone ###-#### Check back.
permit BLD!#-00691 issued Today pep
|