Inspections for the day of: Monday, April 1, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00114 INSP-Sprinkler Rough-in/Hydro4/1/20134/1/20134/1/2013 5:04:44 PMPPART
West conference room okay for cover.
FIR13-00146 INSP-Sprinkler Rough-in4/1/20134/1/20134/1/2013 5:02:16 PMPPART
Okay to cover new sprinkler piping at the restroom addition.
BLD12-02258 FIRE-Conference4/1/20134/1/20134/1/2013 4:59:20 PMPDONE
FIR13-00089 INSP-Final Inspection4/1/20134/1/20134/1/2013 4:58:07 PMPPASS
Scope of work completed. Permit final okay after system is charged.
FIR11-00458 FIR-Aging Inspection4/1/20134/1/20134/1/2013 12:23:59 PM PEND
Pending site inspection request
BLD13-00242 FIRE-Sprinkler Rough-in4/1/20134/1/20134/1/2013 12:20:32 PMAPART
Okay to cover overhead fire sprinkler modifications at the new ceiling. Discussed existing fire alarm system and remodel work.
BLD13-00212 FIRE-Final Inspection3/31/20134/1/20134/1/2013 12:16:09 PMADONE
13th floor fire life safety passed walkthrough. NOTE: fire extinguishers are due annual certification this month.
FIR12-00745 INSP-Sprinkler Rough-in4/1/20134/1/20134/1/2013 12:12:02 PMAPART
Overhead fire sprinkler work at the grid ceilings is approved for cover- ref. dated notes on plans.