ESC13-00013
| Site Preparation | 4/1/2013 | 4/1/2013 | 4/1/2013 12:00:00 AM | A | FAIL |
|
|
Work started. No BMPs in place and contact on ESC sign is not RP listed on permit. written correction notice issued.
|
ESC12-00398
| Conference | 4/1/2013 | 4/1/2013 | 4/1/2013 12:00:00 AM | A | DONE |
|
|
Met with City ESC Inspector, RP (Jamal,ESI), and ACHD Code Enforcement (Ed) at City Hall to discuss violations. Ed from ACHD indicated the storm drain should be sucked out to clean up residue and will pursue this action. Jamal said he currently has an agreement to discharge this water to the sanitary sewer system and that the illicit discharge was a result of mis-management. All other violations identified on 3/29/13 have been corrected.
|