FIR11-00394
| FIR-Aging Inspection | 4/1/2014 | 4/1/2014 | 4/2/2014 10:36:07 AM | | DONE |
|
|
Need site inspection request.
|
FIR14-00148
| INSP-Final Inspection | 3/31/2014 | 4/1/2014 | 4/1/2014 4:05:43 PM | P | NR |
|
|
C/N items pending, visible leakage and pressure loss at the guage during hydro test, project finishes and remodel work underway.
|
FIR14-00148
| INSP-Sprinkler Rough-in/Hydro | 3/31/2014 | 4/1/2014 | 4/1/2014 3:59:05 PM | P | FAIL |
|
|
Noted corrections include; provide matched temp heads at the first floor mens restroom, provide QR head in the 1st floor storage room, two heads at the glass area exceed min. spacing, combustible concealed space adjacent to the south stairway is not protected, repair leak at the storage closet 1st floor, provide thermal barrier at the dry pendent SW entry.
|
FIR13-00661
| INSP-Final Inspection | 4/1/2014 | 4/1/2014 | 4/1/2014 3:42:01 PM | A | PART |
|
|
Okay to final once project finishes are complete.
|
FIR14-00100
| INSP-Sprinkler Rough-in/Hydro | 4/1/2014 | 4/1/2014 | 4/1/2014 1:10:40 PM | A | PART |
|
|
OH work approved for cover.
|
BLD14-00110
| FIRE-Conference | 4/1/2014 | 4/1/2014 | 4/1/2014 1:09:45 PM | A | DONE |
|
|
Regarding remodel work and existing fire sprinkler coverage.
|
BLD14-00433
| FIRE-Conference | 4/1/2014 | 4/1/2014 | 4/1/2014 1:07:07 PM | A | DONE |
|
|
Modifications to the floorplan will require adjustments to existing fire sprinkler coverage at two areas. Discussed door hardware, project related fire alarm work. EM lights and exit signs tested okay.
|