Inspections for the day of: Tuesday, April 1, 2014.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00394 FIR-Aging Inspection4/1/20144/1/20144/2/2014 10:36:07 AM DONE
Need site inspection request.
FIR14-00148 INSP-Final Inspection3/31/20144/1/20144/1/2014 4:05:43 PMPNR
C/N items pending, visible leakage and pressure loss at the guage during hydro test, project finishes and remodel work underway.
FIR14-00148 INSP-Sprinkler Rough-in/Hydro3/31/20144/1/20144/1/2014 3:59:05 PMPFAIL
Noted corrections include; provide matched temp heads at the first floor mens restroom, provide QR head in the 1st floor storage room, two heads at the glass area exceed min. spacing, combustible concealed space adjacent to the south stairway is not protected, repair leak at the storage closet 1st floor, provide thermal barrier at the dry pendent SW entry.
FIR13-00661 INSP-Final Inspection4/1/20144/1/20144/1/2014 3:42:01 PMAPART
Okay to final once project finishes are complete.
FIR14-00100 INSP-Sprinkler Rough-in/Hydro4/1/20144/1/20144/1/2014 1:10:40 PMAPART
OH work approved for cover.
BLD14-00110 FIRE-Conference4/1/20144/1/20144/1/2014 1:09:45 PMADONE
Regarding remodel work and existing fire sprinkler coverage.
BLD14-00433 FIRE-Conference4/1/20144/1/20144/1/2014 1:07:07 PMADONE
Modifications to the floorplan will require adjustments to existing fire sprinkler coverage at two areas. Discussed door hardware, project related fire alarm work. EM lights and exit signs tested okay.