Inspections for the day of: Tuesday, April 1, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection4/1/20144/1/20144/1/2014 4:19:06 PM PASS
No new activity or changes.
ESC13-00283 Aging Inspection4/1/20144/1/20144/1/2014 3:42:41 PM PASS
Landscaping in progress. No work today during the rain. Next inspection it should be stabilized. No violations observed.
ESC13-00997 General Inspection4/1/20144/1/20144/1/2014 2:59:15 PM PASS
ESC13-00277 General Inspection4/1/20144/1/20144/1/2014 2:49:28 PM PASS
WIP. No sediment leaving site. No MS4 in area
ESC13-00447 Aging Inspection4/1/20144/1/20144/1/2014 2:02:34 PM PASS
Addition in progress. No corrections at this time. Permit posted.
ESC13-00939 General Inspection4/1/20144/1/20144/1/2014 1:57:16 PMPPASS
Construction appears to be complete. Some materials still on site. No corrections at this time, will check for Site Final next inspection.
ESC13-00915 General Inspection4/1/20144/1/20144/1/2014 1:56:04 PM PASS
Finaled.
ESC13-00915 DOC - Permit Finaled4/1/20144/1/20144/1/2014 1:55:43 PMPPASS
Grading and utility work is complete. Parking lot has been cleaned. Some materials still on site for vertical construction project. Covered under ESC13-00939. Conditions satisfied for this permit.
ESC13-00161 Aging Inspection4/1/20144/1/20144/1/2014 1:22:20 PM PASS
Finaled.
ESC13-00161 DOC - Permit Finaled4/1/20144/1/20144/1/2014 1:22:02 PMPPASS
Construction is complete. Driveway returned to pre-existing gravel conditions. No further ESC inspections necessary.
ESC13-00130 Aging Inspection4/1/20144/1/20144/1/2014 1:20:35 PM PASS
Project is not yet complete. Permit posted. No stockpiles or activity adjacent to ditch. No corrections required.
ESC13-00193 Conference3/31/20144/1/20144/1/2014 9:26:20 AMPCANC
Conference with Wright construction to confirm that the SWO on site can be lifted and construction can resume. Re-inspection fee already paid.

Tentatively re-scheduled due to rain