BLD14-02855
| FIRE-Final Inspection | 3/31/2015 | 4/1/2015 | 4/3/2015 6:56:45 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD13-03418
| FIRE-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 5:06:06 PM | A | PART |
|
|
Fire life safety walkthrough completed for the print office 147A, IT 151, flex office 153, HR office 154/155, IT work area and hall 170/171. Hardware at the HR office revised while on site, hardware at the print shop to storage area/restroom vestibules to be corrected as discussed.
|
BLD14-03569
| FIRE-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 4:59:29 PM | P | PASS |
|
|
Fire life safety finaled. Inspection passed.
|
FIR15-00051
| INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 4:57:50 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR15-00059
| INSP-Final Inspection | 4/1/2015 | 4/1/2015 | 4/1/2015 4:55:47 PM | P | PASS |
|
|
Fire alarm work passed inspection and functional testing. Permit finaled.
|
BLD13-01666
| FIRE-Final Inspection | 4/1/2015 | 4/1/2015 | 4/1/2015 2:57:32 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR14-00723
| INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 1:59:31 PM | P | PASS |
|
|
Previously noted items finished. Permit final approved.
|
FIR14-00531
| INSP-Sprinkler Rough-in | 3/31/2015 | 4/1/2015 | 4/1/2015 1:21:28 PM | A | PART |
|
|
Inspection completed for connection of trash chute sprinkler heads at towers one and three- floor levels 5th, 3rd and podium.
|
FIR15-00164
| INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 12:54:03 PM | A | PART |
|
|
Will final in conjunction with fire life safety final walkthrough.
|
FIR13-00312
| INSP-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 12:33:26 PM | A | PART |
|
|
Completed walkthrough and functional testing for fire alarm work at the basement level plan sheets 2.0.1 thru 2.0.5. Items noted include; adjust visual notification coverage at three locations to meet spacing at end of corridors, delete or relocate SD for door hold release at NW side, noted non-functional horns at various areas, device address changes at the solvents rooms completed while on site. Also noted missing HD at the elevator machine room-(state elevator certification dated 2014). Manual pull stations, smoke detectors and visual notification tested satisfactory.
|