Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM16-01144 Water Heater Final3/30/20164/1/20164/1/2016 4:08:49 PMPFAIL
Call Tim ###-#### before sending inspector. Phone #: ###-#### Inspection requested via web by James Staley
>T&P and pan drain need to turn out thru skirting and turn down. tech can send picture when complete
PLM15-04325 Final4/1/20164/1/20164/1/2016 3:47:47 PMPPASS
Inspection requested via web by robert almaraz
PLM16-01146 Water Heater Final3/30/20164/1/20164/1/2016 3:12:21 PMPPASS
Water heater install - Homeowner requests afternoon inspection
Thank you Phone #: ###-#### Inspection requested via web by JEREMY LINK
>wh c/o ok
PLM16-00834 Plumbing Rough-in4/1/20164/1/20164/1/2016 2:41:22 PMPPASS
if questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
>corrections made
PLM15-03719 Plumbing Rough-in4/1/20164/1/20164/1/2016 2:29:24 PMPPART
>moved from am
>service bathooms ok
>non potable ok
PLM16-01074 Other4/1/20164/1/20164/1/2016 1:27:24 PMPDONE
conference-- ###-####
>under consideration
PLM15-03719 Plumbing Rough-in3/31/20164/1/20164/1/2016 11:33:39 AMACANC
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
>moved to pm, plumber was going to lunch.
PLM16-00891 Final4/1/20164/1/20164/1/2016 11:29:44 AMAPASS
>rpba correction was made and mounted outside of wall cavity
>pvc 90's were not corrected, contractor chose to leave them.
PLM16-01168 Plumbing Rough-in3/31/20164/1/20164/1/2016 11:07:08 AMAPASS
After 10:00 AM please.

Thank you Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
PLM16-00927 Groundwork3/31/20164/1/20164/1/2016 10:45:10 AMAPASS
Please give me a call when on the way. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
>gw ok, no room for backwater valve, contractor chose not to install one elsewhere in basement.
PLM16-00399 Final4/1/20164/1/20164/1/2016 10:11:07 AMAPASS
>dcva tested
PLM15-04344 Groundwork3/31/20164/1/20164/1/2016 10:08:29 AMAPASS
DON IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
>td ok
>pex underground to hb on n side ok
PLM16-01165 Plumbing Rough-in3/31/20164/1/20164/1/2016 9:44:43 AMAFAIL
Phone #: ###-#### Inspection requested via web by Brian Johansen
>dwv test fail
PLM16-01145 Sprinkler (Final)4/1/20164/1/20164/1/2016 9:28:42 AMAPASS
Inspection requested via web by Michael McDonald
>dcva ok
PLM16-01145 Water and/or Sewer3/30/20164/1/20164/1/2016 9:28:33 AMACANC
Inspection requested via web by Michael McDonald
PLM16-01126 Plumbing Rough-in3/29/20164/1/20164/1/2016 9:14:26 AMAPASS
Chad Lewis is journeyman on the job. Phone #: ###-#### Inspection requested via web by Candice Martin
PLM16-01170 Sprinkler (Final)4/1/20164/1/20164/1/2016 8:28:05 AMAPASS
Phone #: ###-#### Inspection requested via web by Ken Cumpton
>dcva ok
PLM16-01170 Water and/or Sewer3/31/20164/1/20164/1/2016 8:27:42 AMACANC
Phone #: ###-#### Inspection requested via web by Ken Cumpton
PLM16-01172 Sprinkler (Final)3/31/20164/1/20164/1/2016 8:10:03 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Darrell Roark Inspection cancelled from web by: Darrell Roark
PLM16-00858 Water Heater Final4/1/20164/1/20164/1/2016 8:06:36 AMAPASS
>corrected per picture from Kirk
PLM16-01097 Water Heater Final4/1/20164/1/20164/1/2016 8:04:03 AMAPASS
>leak fixed