ELE17-00150
| ELE-Aging Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 12:24:37 PM | | PASS |
|
|
Another contractor took job over and at was finaled.
|
ELE18-04396
| Electrical Rough-In | 4/1/2019 | 4/1/2019 | 4/1/2019 3:10:38 PM | P | PASS |
|
|
Contact is Josh Smith Phone #: ###-#### Inspection requested via web by Candy Magly Ok cover kitch, living and mstr addition. Asked electrician to verify sink size in mstr bath so recept is within 3ft.
|
ELE18-03142
| Final | 4/1/2019 | 4/1/2019 | 4/1/2019 2:50:54 PM | P | PASS |
|
|
Code is DAM Ok final.
|
ELE19-01108
| Rough-In Permanent Service | 3/31/2019 | 4/1/2019 | 4/1/2019 2:35:40 PM | P | PASS |
|
|
The meter and service panel are being moved because the existing mast location is within the new addition on the back of the house, and must be moved to the outside of the new addition in order to get trusses up. The intention is get power reconnected by the end of the day, but we won''t be ready for an inspection until near the end of the day. If you call/text after noon I should be able to provide an estimated time we''ll be ready for the inspection. Phone #: ###-#### Inspection requested via web by Dan Hilke p/s o/h n ok
|
ELE18-01606
| Electrical Rough-In | 3/29/2019 | 4/1/2019 | 4/1/2019 2:10:36 PM | P | PASS |
|
|
Building B, C-Units 3rd ; 4th floors rough in inspection. Building B, 1st floor grid inspection D-Units. Phone #: ###-#### Inspection requested via web by James Kemner Ok cover 1st flr, D units ceilings, 3rd flr, C units, and 1st flr, C corridor.
|
ELE18-01329
| Electrical Rough-In | 3/29/2019 | 4/1/2019 | 4/1/2019 1:25:45 PM | A | PASS |
|
|
This request is for a driveway heat inspection Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok cover.
|
ELE19-01120
| Permanent Service | 4/1/2019 | 4/1/2019 | 4/1/2019 12:43:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams p/s u/g rec ok
|
ELE19-01104
| Conference | 3/31/2019 | 4/1/2019 | 4/1/2019 10:04:21 AM | A | DONE |
|
|
I Want To Walk Through This House I Have Some Questions And Concerns With The Way It Stands Now! Allot Of Work Done And Allot Of Red Flags! Dave Phone #: ###-#### Inspection requested via web by jason shifflett Walked through home with Dave. Numerous areas need addressed. Another person wired home. No past electrical permits were pulled. Mast height needs changed.
|
ELE19-01084
| Electrical Rough-In | 3/29/2019 | 4/1/2019 | 4/1/2019 9:46:57 AM | A | PASS |
|
|
Please call Kevin ###-#### to make sure there is someone home. If you have any questions please feel free to contact Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover kitchen.
|
ELE19-01097
| Temporary Service | 3/29/2019 | 4/1/2019 | 4/1/2019 9:22:41 AM | A | PASS |
|
|
If you have any questions please feel free to contact Luke ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan t/s u/g n ok
|
ELE19-01070
| Final | 3/29/2019 | 4/1/2019 | 4/1/2019 9:22:17 AM | A | PASS |
|
|
There will be people there. If you have any questions please feel free to contact Fred ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. 30a, lockout.
|
ELE19-01069
| Final | 3/29/2019 | 4/1/2019 | 4/1/2019 9:21:53 AM | A | PASS |
|
|
There will be people there. If you have any questions please feel free to contact Fred ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.30a, panel within sight.
|
ELE16-04136
| ELE-Request for Extension | 3/29/2019 | 4/1/2019 | 4/1/2019 6:00:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Extension OK. Job is still in progress.
|
ELE18-01329
| Electrical Rough-In | 3/29/2019 | 4/1/2019 | 3/29/2019 4:37:52 PM | A | CANC |
|
|
this request is for a driveway heat inspection. Thank you! Phone #: ###-#### >> Inspection requested via web by Darryn Coburn Inspection cancelled from web by: Darryn Coburn
|