PLM19-04744
| Final | 4/1/2020 | 4/1/2020 | 4/1/2020 2:56:51 PM | P | PASS |
|
|
if questions call Rick @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM19-04824
| Final | 4/1/2020 | 4/1/2020 | 4/1/2020 2:56:40 PM | P | PASS |
|
|
if questions call Rick @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM20-00172
| Final | 3/31/2020 | 4/1/2020 | 4/1/2020 2:46:26 PM | P | PART |
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to install a rpba on steamer line.
|
PLM20-00614
| Plumbing Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 2:12:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM20-01082
| Final | 3/30/2020 | 4/1/2020 | 4/1/2020 1:50:20 PM | P | PART |
|
|
Back Flow Inspection Phone #: ###-#### Inspection requested via web by Cosme Tapia-Ok to cover, pvb needs tested.
|
PLM20-01083
| Final | 3/30/2020 | 4/1/2020 | 4/1/2020 1:49:45 PM | P | PART |
|
|
Back Flow Inspection Phone #: ###-#### Inspection requested via web by Cosme Tapia-Ok to cover, pvb needs tested.
|
PLM20-01084
| Final | 3/30/2020 | 4/1/2020 | 4/1/2020 1:49:16 PM | P | PART |
|
|
Back Flow Inspection Phone #: ###-#### Inspection requested via web by Cosme Tapia-Ok to cover, pvb needs tested.
|
PLM20-01081
| Final | 3/30/2020 | 4/1/2020 | 4/1/2020 1:48:31 PM | P | PART |
|
|
Back Flow Inspection Phone #: ###-#### Inspection requested via web by Cosme Tapia-Ok to cover, pvb needs tested.
|
PLM20-01420
| Groundwork | 4/1/2020 | 4/1/2020 | 4/1/2020 1:38:06 PM | P | PASS |
|
|
UNDERSLAB WASTE AND VENT INSPECTION. GENERAL CONTRACTOR HAS THE STAMPED DRAWINGS ONSITE AND CLEANOUT HAS BEEN ADDED. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
PLM20-01434
| Groundwork | 4/1/2020 | 4/1/2020 | 4/1/2020 1:00:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|
PLM20-01433
| Groundwork | 4/1/2020 | 4/1/2020 | 4/1/2020 1:00:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|
PLM17-02644
| Final | 3/31/2020 | 4/1/2020 | 4/1/2020 11:05:38 AM | A | NR |
|
|
TML will be on site between 8-9 am to do repairs. Phone #: ###-#### Inspection requested via web by Denise Colin-Homeowner said TML never showed up to fix correction.
|
PLM20-01412
| Water and/or Sewer | 3/31/2020 | 4/1/2020 | 4/1/2020 10:54:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Michael Klaas
|
PLM20-01412
| DOC - Permit Finaled | 4/1/2020 | 4/1/2020 | 4/1/2020 10:54:08 AM | P | PASS |
|
|
|
PLM20-01377
| Final | 3/31/2020 | 4/1/2020 | 4/1/2020 10:37:07 AM | A | PASS |
|
|
Please call homeowner Frank at ###-#### prior to inspection for access to home. Phone #: ###-#### Inspection requested via web by Shawn Overall
|
PLM19-03779
| Final | 3/31/2020 | 4/1/2020 | 4/1/2020 10:24:19 AM | A | PASS |
|
|
CODE: 1469 - if questions call Rick @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM20-01420
| Groundwork | 3/31/2020 | 4/1/2020 | 4/1/2020 9:40:39 AM | A | FAIL |
|
|
INSTALLED UNDERGROUND WASTE AND VENT. PLEASE CALL TO DISCUSS WITH JUSTIN GRIGGS TODAY IF POSSIBLE. THERE IS SOME EXISTING PIPING THAT IS NOT CAPABLE OF PRESSURE TESTING UPSTREAM OF TIE IN POINTS. Phone #: ###-#### Inspection requested via web by RM Mechanical-No approved plans on site.
|
MEC20-01270
| Pressure Test | 3/31/2020 | 4/1/2020 | 4/1/2020 8:47:03 AM | A | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire-20 lb gas test pass.
|
MEC20-01270
| Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 8:46:30 AM | A | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
PLM19-03787
| Final | 3/31/2020 | 4/1/2020 | 4/1/2020 8:13:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|