MEC96-00104
| INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | | PASS |
|
|
/ / 337 - FNL -OK FINAL
|
MEC96-01008
| INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | | PASS |
|
|
/ / 337 - FNL -OK FINAL
|
MEC96-01009
| INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | | PASS |
|
|
/ / 337 - FNL -OK FINAL
|
MEC96-01029
| INSP - Water heater | 4/9/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | A | PASS |
|
|
04/10/96 337 - water heater only at this time FNL -OK FINAL
|
MEC96-01035
| INSP - Final | 4/9/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | A | PASS |
|
|
04/09/96 337 - 1386 FACILITY AME NITRIDE #314 FAB-3 SA1515-STEVE WISCOMB FNL -OK FINAL
|
MEC96-01035
| INSP - Final | 4/9/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | A | PASS |
|
|
04/09/96 337 - 1386 FACILITY AME NITRIDE #314 FAB-3 SA1515-STEVE WISCOMB FNL -OK FINAL
|
MEC96-01044
| INSP - Rough-in & Gas Pressure | 4/9/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | A | CANC |
|
|
04/09/96 337 - 3 each fixtures this is syounts job
|
MEC96-01045
| INSP - Gas pressure test | 4/9/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | PASS |
|
|
04/10/96 337 - this is for late pm FNL -OK FINAL
|
MEC96-01046
| INSP - Gas pressure test | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | PASS |
|
|
04/10/96 337 - STRUCTURAL #BLD96-0011...HEATING WITH NATURAL GAS, PROCES GP -OK GAS PIPING EQUIPMENT. BLDG 33 FED..DINES BLDG #3
|
MEC96-01054
| INSP - Gas pressure test | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | PASS |
|
|
04/10/96 337 - CALL GREG AT ###-#### AND HE WILL MEET YOU THERE. FNL -OK FINAL
|
MEC96-01031
| INSP - Retro Fit (check note) | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | PART |
|
|
04/10/96 337 - WATERHEATER FURANCE-###-#### ASK FOR DENNIS-WILL MEET YOU CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need gas test
|
MEC96-00883
| INSP - Framing/ Rough-in | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | FAIL |
|
|
04/10/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
MEC95-01038
| INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | FAIL |
|
|
04/10/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED RFC -REINSPECTION FEE CHARGED
|
MEC95-01038
| INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 12:00:00 AM | P | FAIL |
|
|
04/10/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED RFC -REINSPECTION FEE CHARGED
|
MEC96-00104
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - CONTACT: XENON LONG ###-####-BUILDING 16TH/SECURITY
|
MEC96-00104
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - CONTACT: XENON LONG ###-####-BUILDING 16TH/SECURITY
|
MEC96-01008
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - BLD 24 CMP BAYS FACILITATE TRENCH EXHAUST WITH A 12" FIBE 26" MAIN FUME EXHAUST TO THE TRENCH EXHAUST BRANCH. $2,834.00-XENON LONG ###-####
|
MEC96-01008
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - BLD 24 CMP BAYS FACILITATE TRENCH EXHAUST WITH A 12" FIBE 26" MAIN FUME EXHAUST TO THE TRENCH EXHAUST BRANCH. $2,834.00-XENON LONG ###-####
|
MEC96-01009
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - BUILDING 5/RM 210C PROVIDE AND INSTALL HVAC DUCT WORK, VA REMODEL THE QA LAB-YMC JOB #G-8203-$30,527.00-XENON LONG ###-####
|
MEC96-01009
| INSP - Final | 4/5/1996 | 4/10/1996 | 4/9/1996 12:00:00 AM | A | CANC |
|
|
04/08/96 337 - BUILDING 5/RM 210C PROVIDE AND INSTALL HVAC DUCT WORK, VA REMODEL THE QA LAB-YMC JOB #G-8203-$30,527.00-XENON LONG ###-####
|