BLD00-00222
| BLD-Framing/Rough-in | 4/7/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | A | NR |
|
|
ross ###-#### fr Need electrical before a frame insp. 4/11/00 10:45:47 AM
|
BLD00-00362
| BLD-Wall cover | 4/7/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 15:52:19. Contact: . Still waiting for clarification from Briggs. 4/11/00 10:46:58 AM
|
BLD00-00225
| BLD-Energy code compliance | 4/7/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | A | PASS |
|
|
Eric, ###-#### - as early as possible please New Mec. check ok as is 4/11/00 10:46:46 AM
|
BLD00-00749
| BLD-Footing | 4/7/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 16:35:41. Contact: ###-####.
|
BLD99-03332
| BLD-Other | 4/10/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 09:58:27. Contact: . Shear 2nd fail C/N 4/11/00 10:46:31 AM
|
BLD00-00241
| BLD-Framing/Rough-in | 4/10/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | P | FAIL |
|
|
MATT ###-#### FR C/N posted 4/11/00 10:46:14 AM
|
BLD99-00810
| BLD-Final | 4/10/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | P | FAIL |
|
|
val ###-####
|
BLD00-00616
| BLD-Framing/Rough-in | 4/10/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | P | CANC |
|
|
###-####\\shear wall Trans to 301 4/11/00 10:46:22 AM
|
BLD00-00699
| BLD-Footing | 4/10/2000 | 4/10/2000 | 4/10/2000 12:00:00 AM | P | NR |
|
|
###-#### Nothing at site 4/11/00 10:46:07 AM
|