BLD00-03730
| BLD-Final | 4/6/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 11:46:08. Contact: ###-####.
|
BLD01-00141
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 11:27:40. Contact: ###-####.c/n need header over doors. 4/10/2001 10:19:52 AM
|
BLD00-03516
| BLD-Concrete | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 13:38:10. Contact: ###-####. grout pour ok / no shrink grout ok pour back at mez ok for cover. 4/10/2001 3:27:32 PM
|
BLD00-03068
| BLD-Other | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:31:46. Contact: ###-####. roof deck welding in progess appeares ok special insp. on site and will verify north half in report upon completion. 4/10/2001 10:58:18 AM
|
BLD01-00661
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | NR |
|
|
jim --###-#### r/i fire blk/ele insp. 4/10/2001 2:35:13 PM
|
BLD00-01182
| BLD-Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
access code is 1001 Duane ###-####
|
BLD00-03658
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PART |
|
|
Dan ###-#### need fire proofing on beams above ducts./framing ok. 4/10/2001 2:43:32 PM
|
BLD00-03696
| BLD-Final | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 13:44:36. Contact: ###-####. need approved plan and occ card with p&z sign off. 4/10/2001 4:01:57 PM
|
BLD00-01563
| BLD-Concrete | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 05:52:18. Contact: ###-####. placed with special insp. pending report. 4/10/2001 2:44:15 PM
|