BLD01-00436
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00731
| BLD-Footing | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 11:49:05. Contact: ###-####.Zxc 4/10/2001 11:42:42 AM
|
BLD00-03077
| BLD-Footing | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | FAIL |
|
|
Larry ###-#### Footing poured W/O insp ... Craig said Tom already looked at it?.......... 4/10/2001 11:22:35 AM
|
BLD01-00063
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
###-#### shear
|
BLD01-00416
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:44:58. Contact: ###-####. Contr called in wrong job. 4/10/2001 10:49:22 AM
|
BLD01-00745
| BLD-Foundation | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 06:53:41. Contact: ###-####.
|
BLD00-03319
| BLD-Foundation | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PART |
|
|
re-bar insp for retaining wall ###-#### Insp of approx 25' ret wall (west end) Horiz and verts approx 12" O.C. 4/10/2001 4:31:21 PM
|
BLD00-02665
| BLD-Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
ED ###-#### access code is 7777 enter C/C issued. 4/10/2001 4:58:48 PM
|
BLD01-00355
| BLD-Foundation | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Gary ###-#### All found walls and pad at interior side of garage north wall.....OK. 4/10/2001 1:48:33 PM
|
BLD01-00371
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PART |
|
|
Shear OK. 4/10/2001 2:51:11 PM
|