PLM01-01045
| Sprinkler (Final) | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PASS |
|
|
Douglas ###-####
|
PLM01-01055
| Water and/or Sewer | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | FAIL |
|
|
drew ###-#### w/s final need to change one inch building supply line to inch -one quarter. need approved materials where water and sewer cross.need to test both water and sewer lines.cleanouts to be installed in direction of flow need approved transition from pvc to abs pipe. 4/10/2001 11:29:41 AM
|
PLM00-03311
| Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | CANC |
|
|
Scott ###-#### late as possible plumbing contractot called and canc. 4/10/2001 2:18:16 PM
|
PLM01-00278
| Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Lee ###-####
|
PLM01-00967
| Plumbing Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Rob ###-#### need to add three fixtures to permit for additional upstairsbath room. 4/10/2001 2:16:12 PM
|
PLM01-01068
| Sprinkler (Final) | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-01069
| Sprinkler (Final) | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-01033
| Groundwork | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 4/10/2001 12:18:42 PM
|
PLM01-01034
| Groundwork | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 4/10/2001 12:20:10 PM
|