Inspections for the day of: Tuesday, April 10, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03339 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMAPART
partial fr insp- -scott ###-#### -party wall Firewall ok between units 4/10/2001 11:43:08 AM 4/10/2001 11:43:21 AM
BLD00-03338 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMAPART
scott ###-#### partial fr--Firewall between units, ok 4/10/2001 11:43:43 AM
BLD00-02543 BLD-Energy code compliance4/9/20014/10/20014/10/2001 12:00:00 AMAPART
Jim ###-#### early as possible: C/n posted on site--ok to cover except fireplace areas, provide energy report prior to issuance of c. of o., repair damaged floor joist in crawl. 4/10/2001 9:11:22 AM
BLD01-00444 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMAFAIL
shear\\###-#### C/N posted on site-not ready 4/10/2001 10:41:56 AM
BLD01-00519 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/10/2001 at 07:24:28. Contact: ###-####. C/N posted- 4/10/2001 11:11:59 AM
BLD01-00549 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 04/10/2001 at 07:29:47. Contact: ###-####. Cancelled by contractor--not ready 4/10/2001 9:00:36 AM
BLD01-00815 BLD-Footing4/10/20014/10/20014/10/2001 12:00:00 AMPPART
nick ###-#### WIP 4/10/2001 1:12:10 PM
BLD01-00643 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
reinspection Jim ###-####
BLD01-00270 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/10/2001 at 08:57:05. Contact: . C/N posted on site 4/10/2001 2:29:29 PM
MEC01-00927 Final4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2001 at 09:48:59. Contact: ###-####. Fireplace--prior c/n item addressed and approved. 4/10/2001 1:34:42 PM
MEC01-01029 Final4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2001 at 10:12:28. Contact: ###-####.
BLD01-00560 BLD-Footing4/10/20014/10/20014/10/2001 12:00:00 AMPNR
Jerry ###-#### wip 4/10/2001 1:23:21 PM
BLD01-00338 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2001 at 11:25:26. Contact: ###-####. SHEAR---Prior c/n item corrected. 4/10/2001 3:45:11 PM
BLD01-00374 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMPFAIL
###-#### C/N posted on site-missing mst straps and shear panel nail penetration beyond acceptable depth. 4/10/2001 3:03:31 PM