BLD00-03339
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PART |
|
|
partial fr insp- -scott ###-#### -party wall Firewall ok between units 4/10/2001 11:43:08 AM 4/10/2001 11:43:21 AM
|
BLD00-03338
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PART |
|
|
scott ###-#### partial fr--Firewall between units, ok 4/10/2001 11:43:43 AM
|
BLD00-02543
| BLD-Energy code compliance | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | PART |
|
|
Jim ###-#### early as possible: C/n posted on site--ok to cover except fireplace areas, provide energy report prior to issuance of c. of o., repair damaged floor joist in crawl. 4/10/2001 9:11:22 AM
|
BLD01-00444
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | FAIL |
|
|
shear\\###-#### C/N posted on site-not ready 4/10/2001 10:41:56 AM
|
BLD01-00519
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 07:24:28. Contact: ###-####. C/N posted- 4/10/2001 11:11:59 AM
|
BLD01-00549
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 07:29:47. Contact: ###-####. Cancelled by contractor--not ready 4/10/2001 9:00:36 AM
|
BLD01-00815
| BLD-Footing | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PART |
|
|
nick ###-#### WIP 4/10/2001 1:12:10 PM
|
BLD01-00643
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
reinspection Jim ###-####
|
BLD01-00270
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 08:57:05. Contact: . C/N posted on site 4/10/2001 2:29:29 PM
|
MEC01-00927
| Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 09:48:59. Contact: ###-####. Fireplace--prior c/n item addressed and approved. 4/10/2001 1:34:42 PM
|
MEC01-01029
| Final | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 10:12:28. Contact: ###-####.
|
BLD01-00560
| BLD-Footing | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | NR |
|
|
Jerry ###-#### wip 4/10/2001 1:23:21 PM
|
BLD01-00338
| BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 11:25:26. Contact: ###-####. SHEAR---Prior c/n item corrected. 4/10/2001 3:45:11 PM
|
BLD01-00374
| BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 12:00:00 AM | P | FAIL |
|
|
###-#### C/N posted on site-missing mst straps and shear panel nail penetration beyond acceptable depth. 4/10/2001 3:03:31 PM
|