Inspections for the day of: Tuesday, April 10, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01015 Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMANR
rhonda ###-#### r/i
MEC01-01015 Pressure Test4/9/20014/10/20014/10/2001 12:00:00 AMANR
rhonda-- ###-#### pres test
BLD01-00543 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMAPART
after 9:00 gary ###-#### 4/10/2001 10:48:52 AM c/n on site ok to insulate 4/10/2001 11:03:51 AM
BLD00-02809 BLD-Conference4/9/20014/10/20014/10/2001 12:00:00 AMACANC
tim ###-#### bldg #4
BLD00-02820 BLD-Foundation4/9/20014/10/20014/10/2001 12:00:00 AMAPASS
tim ###-#### bldg #6
BLD01-00665 BLD-Framing/Rough-in4/9/20014/10/20014/10/2001 12:00:00 AMAPASS
Terry ###-#### around 10-12 if possible
MEC01-01023 Pressure Test4/9/20014/10/20014/10/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/09/2001 at 15:20:07. Contact: ###-####. 4/10/2001 9:33:52 AM
BLD00-02582 BLD-Final4/10/20014/10/20014/10/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 04/10/2001 at 07:49:05. Contact: ###-####.
BLD01-00102 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
bill ###-#### 4/10/2001 2:31:20 PM hold downs have been corrected framing is good oked to insulate 4/10/2001 3:22:12 PM
BLD01-00103 BLD-Framing/Rough-in4/10/20014/10/20014/10/2001 12:00:00 AMPPASS
bill ###-#### hold downs have been corrected framing passed ok to insulate 4/10/2001 3:23:45 PM
MEC01-00590 Final4/9/20014/10/20014/10/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/09/2001 at 08:43:15. Contact: ###-####.