BLD02-00189
| BLD-Framing/Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
ceiling grid- tim ###-#### ...grid clg ok 4/10/2002 3:46:53 PM
|
BLD01-00606
| BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 16:49:55. Contact: ###-####. complete stair rails (extensions, etc.) obtain other perm finals; ok for t/o 4/10/2002 12:03:26 PM
|
BLD01-00597
| BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 16:50:51. Contact: ###-####. complete rail extensions, install back draft dampers at ext. & viewport glass at doors, doors to latch. ok for t/o 4/10/2002 12:07:40 PM 4/10/2002 12:07:56 PM
|
BLD98-03705
| BLD-Footing | 4/8/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 15:11:36. Contact: . pending report, looks ok. 4/10/2002 10:16:41 AM
|
BLD02-00633
| BLD-Foundation | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 06:50:27. Contact: ###-####. walls ok 4/10/2002 5:11:49 PM
|
BLD02-00383
| BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | NR |
|
|
###-#### DAVE FN
|
MIS02-00053
| BLD-Final | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | FAIL |
|
|
###-####; 4/10/2002 3:48:51 PM need fire, health, verify elec permit; consult fire re blocked rear exit. 4/10/2002 3:58:19 PM
|
BLD01-00596
| BLD-Conference | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
w/ supt re final, complete c/n re rails & extensions.
|
BLD01-00604
| BLD-Conference | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
w/ rail fabricator re c/n...install extensions as req'd
|
BLD98-03705
| BLD-Conference | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
met onsite w new supt...Ron, discussed ongoing exit issues
|