Inspections for the day of: Wednesday, April 10, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00890 Rough-in4/9/20024/10/20024/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/09/2002 at 16:34:36. Contact: ###-####.
BLD02-00608 BLD-Footing4/9/20024/10/20024/10/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/09/2002 at 16:52:42. Contact: ###-####. no rebar yet, also house is shorter front to rear y approx 2 foot, told them they would need this approved by a framing inspection. from office. not field inspector. 4/10/2002 11:24:10 AM
MEC02-00910 Pressure Test4/9/20024/10/20024/10/2002 12:00:00 AMACANC
sam--###-####
MEC02-00923 Final4/9/20024/10/20024/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/09/2002 at 11:34:16. Contact: ###-####.
BLD02-00497 BLD-Final4/9/20024/10/20024/10/2002 12:00:00 AMPPASS
###-####
MEC02-00768 Rough-in4/8/20024/10/20024/10/2002 12:00:00 AMPPART
travis ###-#### r/i Owner extending some duct 4/11/2002 2:39:52 PM
BLD02-00029 BLD-Framing/Rough-in4/10/20024/10/20024/10/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 07:45:34. Contact: ###-####.
BLD02-00349 BLD-Framing/Rough-in4/10/20024/10/20024/10/2002 12:00:00 AMPFAIL
###-#### jason New detail from the architect is ok , it indicates wraping steel beam above the 2x4 wall. As I indicated would need to be done but should have been shown on a plan detail, Yester day the detail was supposed to be on site, Owner is doing his own work and does not understand the concept of 1hr protection etc to flutes and wraping steel beam. Note: as I explained to him if he would like more explanation call his architect out to the job. 4/10/2002 1:58:01 PM