MEC02-00890
| Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 16:34:36. Contact: ###-####.
|
BLD02-00608
| BLD-Footing | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 16:52:42. Contact: ###-####. no rebar yet, also house is shorter front to rear y approx 2 foot, told them they would need this approved by a framing inspection. from office. not field inspector. 4/10/2002 11:24:10 AM
|
MEC02-00910
| Pressure Test | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | CANC |
|
|
sam--###-####
|
MEC02-00923
| Final | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 11:34:16. Contact: ###-####.
|
BLD02-00497
| BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-00768
| Rough-in | 4/8/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PART |
|
|
travis ###-#### r/i Owner extending some duct 4/11/2002 2:39:52 PM
|
BLD02-00029
| BLD-Framing/Rough-in | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 07:45:34. Contact: ###-####.
|
BLD02-00349
| BLD-Framing/Rough-in | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | FAIL |
|
|
###-#### jason New detail from the architect is ok , it indicates wraping steel beam above the 2x4 wall. As I indicated would need to be done but should have been shown on a plan detail, Yester day the detail was supposed to be on site, Owner is doing his own work and does not understand the concept of 1hr protection etc to flutes and wraping steel beam. Note: as I explained to him if he would like more explanation call his architect out to the job. 4/10/2002 1:58:01 PM
|