Inspections for the day of: Wednesday, April 10, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00075 BLD-Conference4/9/20024/10/20024/10/2002 12:00:00 AMANH
###-####---rachel ///left card for her to call to set up card,,, I have not been able to get through on phone 4/10/2002 10:15:00 AM
BLD98-02259 BLD-Footing4/9/20024/10/20024/10/2002 12:00:00 AMAPART
###-####
permit has been re-issued, existing ftgs ok per letter on file, all work done to this point has attached engineering of approval, needs to be on site w/ approved plans 4/10/2002 11:31:10 AM
MEC02-00901 Rough-in4/9/20024/10/20024/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/09/2002 at 12:54:44. Contact: ###-####.fire place ok, need to clean debris from around and on top of unit,,, no gas yet,, also fix vent at top of unit 4/10/2002 10:05:34 AM
MEC02-00938 Pressure Test4/9/20024/10/20024/10/2002 12:00:00 AMAFAIL
derrick- ###-#### pres test -re-insp
c/n posted 4/10/2002 10:42:56 AM
BLD02-00337 BLD-Framing/Rough-in4/9/20024/10/20024/10/2002 12:00:00 AMAPART
re-inspect shear 4/9/2002 2:19:35 PM
ext shear ok 4/10/2002 10:02:24 AM
BLD02-00586 BLD-Framing/Rough-in4/9/20024/10/20024/10/2002 12:00:00 AMAPART
CALL FIRST ###-#### WALT
rear hds ok, need to nail per plan, (on rear section) re-call 4/10/2002 11:21:46 AM
MEC02-00420 Final4/10/20024/10/20024/10/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 08:34:49. Contact: ###-####.
MEC02-00924 Final4/10/20024/10/20024/10/2002 12:00:00 AMPPASS
###-#### curtis (TONY: WOULD YOU PLEASE CHECK TO SEE IF THESE PEOPLE NEED A BUILDING PERMIT FOR THE REMODEL THEY ARE DOING)
BLD02-00696 BLD-Footing4/10/20024/10/20024/10/2002 12:00:00 AMPPART
###-####
grade beam cololms ok 4/10/2002 12:08:31 PM
MEC02-00874 Final4/10/20024/10/20024/10/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 11:08:16. Contact: ###-####.
MEC02-00101 Final4/10/20024/10/20024/10/2002 12:00:00 AMPPASS
###-#### jack
BLD02-00300 BLD-Foundation4/10/20024/10/20024/10/2002 12:00:00 AMPPART
foundation wall only, not int. pads 4/10/2002 3:34:19 PM
BLD02-00697 BLD-Framing/Rough-in4/9/20024/10/20024/10/2002 12:00:00 AMPPART
###-####
downstairs ok for cover,//// upstairs bed room addition w/in main room has SWO untill permit is altered or obtained,,, then call for frame insp.,,, verify trades are signed off 4/10/2002 2:30:11 PM
BLD01-02829 BLD-Energy code compliance4/5/20024/10/20024/10/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/05/2002 at 13:39:45. Contact: ###-####.