MIS02-00075
| BLD-Conference | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | NH |
|
|
###-####---rachel ///left card for her to call to set up card,,, I have not been able to get through on phone 4/10/2002 10:15:00 AM
|
BLD98-02259
| BLD-Footing | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
###-####
permit has been re-issued, existing ftgs ok per letter on file, all work done to this point has attached engineering of approval, needs to be on site w/ approved plans 4/10/2002 11:31:10 AM
|
MEC02-00901
| Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 12:54:44. Contact: ###-####.fire place ok, need to clean debris from around and on top of unit,,, no gas yet,, also fix vent at top of unit 4/10/2002 10:05:34 AM
|
MEC02-00938
| Pressure Test | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | FAIL |
|
|
derrick- ###-#### pres test -re-insp
c/n posted 4/10/2002 10:42:56 AM
|
BLD02-00337
| BLD-Framing/Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
re-inspect shear 4/9/2002 2:19:35 PM
ext shear ok 4/10/2002 10:02:24 AM
|
BLD02-00586
| BLD-Framing/Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | A | PART |
|
|
CALL FIRST ###-#### WALT
rear hds ok, need to nail per plan, (on rear section) re-call 4/10/2002 11:21:46 AM
|
MEC02-00420
| Final | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 08:34:49. Contact: ###-####.
|
MEC02-00924
| Final | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
###-#### curtis (TONY: WOULD YOU PLEASE CHECK TO SEE IF THESE PEOPLE NEED A BUILDING PERMIT FOR THE REMODEL THEY ARE DOING)
|
BLD02-00696
| BLD-Footing | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PART |
|
|
###-####
grade beam cololms ok 4/10/2002 12:08:31 PM
|
MEC02-00874
| Final | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 11:08:16. Contact: ###-####.
|
MEC02-00101
| Final | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
###-#### jack
|
BLD02-00300
| BLD-Foundation | 4/10/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PART |
|
|
foundation wall only, not int. pads 4/10/2002 3:34:19 PM
|
BLD02-00697
| BLD-Framing/Rough-in | 4/9/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PART |
|
|
###-####
downstairs ok for cover,//// upstairs bed room addition w/in main room has SWO untill permit is altered or obtained,,, then call for frame insp.,,, verify trades are signed off 4/10/2002 2:30:11 PM
|
BLD01-02829
| BLD-Energy code compliance | 4/5/2002 | 4/10/2002 | 4/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 13:39:45. Contact: ###-####.
|