Inspections for the day of: Monday, April 10, 2006.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-01166 Electrical Rough-In4/10/20064/10/20064/10/2006 4:23:11 PMPPASS
Mike -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong walls only ok
ELE05-03187 Final4/10/20064/10/20064/10/2006 3:59:49 PMPPASS
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok
ELE05-03919 Final4/10/20064/10/20064/10/2006 3:22:23 PMPFAIL
PLEASE CALL DAVE BRADSHAW & HE WILL MEET THE INSPECTOR @ THE JOBSITE; Phone #: ###-#### Internet Inspection Request from: Randy Vail
corr. called 250.8 no SMS allowed for grds or bonds, 310.15 (B)(2) table derate at 50%, 250.122(B) shall increase equip grds also for size, 250.12shall remove paint for clean surface at equip grd bus j box,, 250.126 for equip grd bus at jbox
ELE05-04628 Final4/10/20064/10/20064/10/2006 2:20:05 PMPPASS
kent; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok
ELE06-00015 Final4/10/20064/10/20064/10/2006 2:19:41 PMPPASS
Scheduled by a contractor via Hello! on 4/10/2006 at 7:45:00 AM. Contact: ###-####. ok
ELE06-00081 ELE-Aging Inspection4/10/20064/10/20064/10/2006 1:25:23 PM NR
no new signs installed yet
ELE04-02822 Final4/8/20064/10/20064/10/2006 1:24:48 PMPPASS
final inspection, made corrections on disconnect; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa corr. made
ELE06-00422 Electrical Rough-In4/7/20064/10/20064/10/2006 9:55:55 AMAPART
this is for an inspection at the reception area. any questions please call Steve Nuxoll; Phone #: ###-#### Internet Inspection Request from: Jeff Radford ok
ELE06-00053 Final4/10/20064/10/20064/10/2006 8:45:27 AMAPASS
sign faces changed final ok