Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02000 BLD-Final4/10/20084/10/20084/11/2008 1:58:10 PMPPASS
Scheduled by a contractor via Hello! on 4/10/2008 at 8:05:42 AM. Contact: ###-####.
BLD07-02948 BLD-Final4/10/20084/10/20084/10/2008 6:53:09 PMPPASS
Scheduled by a contractor via Hello! on 4/10/2008 at 8:03:33 AM. Contact: ###-####. ok for perm occ
BLD06-03522 BLD-Final4/10/20084/10/20084/10/2008 6:52:21 PMPPASS
Justin Phone #: ###-####ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD08-00454 BLD-Wall cover4/10/20084/10/20084/10/2008 3:46:27 PMPPASS
Scheduled by a contractor via Hello! on 4/10/2008 at 8:07:21 AM. Contact: ###-####. ok to cover walls
BLD07-02826 BLD-Wall cover4/10/20084/10/20084/10/2008 2:14:41 PMPPART
Erv, ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt grid ok but need to patch fire proofing on beams ok to start laying tiles
BLD07-02825 BLD-Wall cover4/10/20084/10/20084/10/2008 2:14:19 PMPPART
Erv, ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt grid ok but need to patch fire proofing on beams ok to start laying tiles
BLD08-00220 BLD-Framing/Rough-in4/9/20084/10/20084/10/2008 1:36:08 PMPFAIL
mike - t-grid inspection - Phone #: ###-#### mec not wired up and some wires are out of plumb
BLD07-01690 BLD-Framing/Rough-in4/9/20084/10/20084/10/2008 12:31:07 PMAPART
rock Phone #: ###-#### ceilings grid ok to cover