Inspections for the day of: Friday, April 10, 2009.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC04-00024 Site Final4/10/20094/10/20094/10/2009 4:18:07 PMPPASS
ok all work complete
ESC05-01249 Site Final4/10/20094/10/20094/10/2009 4:17:20 PMPPASS
ok all work complete
ESC04-00163 Site Final4/10/20094/10/20094/10/2009 4:16:32 PMPPASS
ok all work complete
ESC07-00272 Site Final4/10/20094/10/20094/10/2009 4:15:40 PMPPASS
ok all work complete
ELE09-00562 Electrical Rough-In4/6/20094/10/20094/10/2009 3:01:01 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE09-00562 Final4/10/20094/10/20094/10/2009 3:00:53 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE07-02834 Final4/7/20094/10/20094/10/2009 2:35:32 PMPFAIL
lars - please call 1/2 hr prior for access Phone #: ###-#### job not ready shall wire spa too meet article 680 of NEC, spa wiring is a complete mess called
ELE09-00604 Permanent Service4/10/20094/10/20094/10/2009 1:44:11 PMPFAIL
insp on moving the sub panel//Ron ###-#### see added r/i
ELE09-00604 Electrical Rough-In4/10/20094/10/20094/10/2009 1:43:49 PMPFAIL
insp on moving the sub panel//Ron ###-#### 314.28(A)(2) shall provide 6X for raceway entries at jbox, 310.16 shall not use $ copper for 100 amp commercial job,200.6&7 shall not ID 6 or smaller neutral shall be white, shall ID neutral used as phase in cables, 250.148 shall terminate all equip. grds to jbox (old panel)BCC no vilations retained grding and bonding at p/s shall meet article 250, also 110.3(B) manufactures instructions use manufactures listed breakers only called left message
ELE08-02167 Electrical Rough-In4/9/20094/10/20094/10/2009 11:07:13 AMAPART
andy Phone #: ###-#### north and east corner ok building ceiling ok only still needs to meet 300.4 (E) for other areas, also 250.122 (B) for pole lights size of equip grd
ELE09-00598 Temporary Service4/10/20094/10/20094/10/2009 10:23:12 AMAPASS
t/s u/g new ok
ELE09-00598 Electrical Rough-In4/9/20094/10/20094/10/2009 10:22:49 AMACANC
###-#### Internet Inspection Request from: Todd Holbrook see added t/s
ELE09-00300 Electrical Rough-In4/9/20094/10/20094/10/2009 9:48:13 AMAFAIL
please provide rough in inspection for bathroom radient floor heat in main and master bathroom. Call Dave if you have any questions. Phone #: ###-#### Internet
Inspection Request from: David Mackey
called 110.3(B) shall follow manufactures instructions for installation of floor heat, I marked the sections on instruction sheet, spacing and placement of sensor lead
ESC08-00950 General Inspection4/10/20094/10/20094/10/2009 9:44:58 AMAPASS
ELE09-00340 Final4/9/20094/10/20094/10/2009 8:53:12 AMAPASS
please final. All underground work is complete and lighting is operational again. Call Dave if you have any questions Phone #: ###-#### Internet Inspection Request from: David Mackey
ELE09-00563 Final4/10/20094/10/20094/10/2009 8:13:24 AMAPASS
inspection on service only, power has been off over a year. any questions call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose
ELE09-00563 Permanent Service4/9/20094/10/20094/10/2009 8:10:00 AMAPASS
inspection on service only, power has been off over a year. any questions call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose
p/s u/g rec. okl
ELE09-00578 Final4/10/20094/10/20094/10/2009 8:09:06 AMAPASS