BLD11-01555
| FIRE-Conference | 4/10/2012 | 4/10/2012 | 4/10/2012 3:43:05 PM | P | DONE |
|
|
I went over possible pendant sprinkler obstructions due to light fixtures with the project superintendant. Also went over fire extinguisher placement and fire dept. access.
|
FIR12-00041
| INSP-Sprinkler Rough-in | 4/10/2012 | 4/10/2012 | 4/10/2012 3:38:02 PM | P | PASS |
|
|
The garage sprinkler piping can now be covered.
|
FIR12-00138
| INSP-Final Inspection | 4/6/2012 | 4/10/2012 | 4/10/2012 3:36:48 PM | A | PASS |
|
|
permit finaled
|
FIR12-00137
| INSP-Final Inspection | 4/6/2012 | 4/10/2012 | 4/10/2012 3:36:22 PM | A | PASS |
|
|
permit finaled
|