BLD14-00151
| BLD-Final | 4/9/2014 | 4/10/2014 | 4/11/2014 10:57:59 AM | A | PASS |
|
|
Brandon Boomgarden Phone #: ###-####
|
BLD13-03344
| BLD-Conference | 4/10/2014 | 4/10/2014 | 4/11/2014 10:14:28 AM | P | PEND |
|
|
Provide notice that temp occ will expire in June and that occupancy is limited to 49 people for all events. I talked with owner she will talk with her arch and city
|
MIS13-00323
| BLD-Conference | 4/10/2014 | 4/10/2014 | 4/11/2014 10:12:55 AM | P | PEND |
|
|
Check status. Repost if necessary. talked with dave they have removed all of the high racking but still have things stored dave will talk to owner and get a hold of plan reveiw
|
BLD13-00938
| BLD-Other | 4/10/2014 | 4/10/2014 | 4/11/2014 10:10:18 AM | P | NR |
|
|
fire stop - 2nd floor core Phone #: ###-####
|
BLD14-00153
| BLD-Framing/Rough-in | 4/10/2014 | 4/10/2014 | 4/11/2014 6:34:18 AM | P | PASS |
|
|
Framing inspection so we can insulate please. Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
|
BLD14-00520
| BLD-Foundation | 4/10/2014 | 4/10/2014 | 4/10/2014 2:33:22 PM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD13-03072
| BLD-Footing | 4/10/2014 | 4/10/2014 | 4/10/2014 2:32:27 PM | P | PASS |
|
|
Heron Phone #: ###-####
|
BLD13-03126
| BLD-Framing/Rough-in | 4/9/2014 | 4/10/2014 | 4/10/2014 1:30:26 PM | P | PASS |
|
|
Ren Phone #: ###-####
|
BLD14-00827
| BLD-Footing | 4/9/2014 | 4/10/2014 | 4/10/2014 11:39:39 AM | A | PASS |
|
|
brian - late morning please Phone #: ###-####
|
BLD13-02952
| BLD-Framing/Rough-in | 4/9/2014 | 4/10/2014 | 4/10/2014 10:44:11 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
|
BLD13-03501
| BLD-Framing/Rough-in | 4/9/2014 | 4/10/2014 | 4/10/2014 9:55:24 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner c/n on site ok to insulate
|
BLD13-00180
| BLD-Foundation | 4/9/2014 | 4/10/2014 | 4/10/2014 9:40:52 AM | A | PART |
|
|
JC Phone #: ###-#### walked project with JC MTI on site covering spec inspection
|