FIR15-00096
| INSP-Conference | 4/10/2015 | 4/10/2015 | 4/10/2015 5:29:59 PM | P | PEND |
|
|
|
FIR14-00316
| INSP-Final Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 5:27:13 PM | P | PASS |
|
|
Plan modification verified. Scope of work completed, fire sprinkler permit finaled.
|
FIR14-00778
| INSP-Sprinkler Rough-in/Hydro | 4/9/2015 | 4/10/2015 | 4/10/2015 5:25:33 PM | A | PART |
|
|
Verified plan modifications. Dry system area G upper and lower levels plan sheet 3 okayed for cover.
|
FIR14-00531
| INSP-Sprinkler Rough-in | 4/8/2015 | 4/10/2015 | 4/10/2015 5:12:23 PM | A | DEFR |
|
|
This is 4th fl. Please call 1/2 hr prior to inspection. Nate is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR14-00316
| INSP-Final Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 1:54:53 PM | P | PART |
|
|
Please call Leroy 30 mins prior Please schedule after 3:30 Phone #: ###-#### Inspection requested via web by Jacci Hunt
|