Inspections for the day of: Friday, April 10, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03319 BLD-Final4/9/20154/10/20154/10/2015 3:24:00 PMPNR
Greg Phone #: ###-####. Fire/life/safety failed.
BLD15-00333 BLD-Framing/Rough-in4/10/20154/10/20154/10/2015 3:23:23 PMPPASS
Call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD15-01142 BLD-Conference4/9/20154/10/20154/10/2015 2:07:12 PMPPASS
replace all windows and one patio door Phone #: ###-#### Inspection requested via web by mark bedard
BLD15-01142 DOC - Permit Finaled4/10/20154/10/20154/10/2015 2:06:54 PMPPASS
BLD15-00781 BLD-Footing4/9/20154/10/20154/10/2015 1:33:29 PMPNR
Dane Phone #: ###-####. No one on site, no forms built.
BLD15-00070 BLD-Wall Bracing4/10/20154/10/20154/10/2015 1:32:36 PMPCANC
Chris Phone #: ###-####
BLD15-00070 BLD-Ceiling Grid Inspection4/10/20154/10/20154/10/2015 1:30:42 PMPPASS
Chris Phone #: ###-####
BLD15-00333 BLD-Energy code compliance4/10/20154/10/20154/10/2015 12:32:05 PMPPASS
Call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD14-03435 BLD-Framing/Rough-in4/9/20154/10/20154/10/2015 11:39:26 AMAFAIL
Dave-call for access Phone #: ###-####. Install straps for portal frame, complete airseal pack, complete scab on two ply bonus roo truss as noted on truss enginnering. Strap top plate at plumbing penetration.
BLD14-02785 BLD-Framing/Rough-in4/8/20154/10/20154/10/2015 10:48:06 AMAPASS
Jeremy// please call before Phone #: ###-####
BLD14-03217 BLD-Final4/9/20154/10/20154/10/2015 10:33:30 AMAFAIL
call for access code - Jim Phone #: ###-####. Needs to provide the required insulation cert. Post the blower door test result or provide the 3rd. party airseal inspection reoprt. Correction notice posted.
BLD13-03600 BLD-Wall Bracing4/9/20154/10/20154/10/2015 10:05:25 AMAPASS
interior shear 1st floor Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD13-03598 BLD-Conference4/9/20154/10/20154/10/2015 10:04:13 AMAPASS
interior shear 2nd floor Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD13-03593 BLD-Wall Bracing4/9/20154/10/20154/10/2015 10:02:49 AMANR
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD13-03592 BLD-Wall Bracing4/9/20154/10/20154/10/2015 10:01:48 AMANR
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD14-03662 BLD-Final4/9/20154/10/20154/10/2015 8:52:22 AMANR
Brett Phone #: ###-####. Needs mech. final.