Inspections for the day of: Friday, April 10, 2015.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00614 General Inspection4/10/20154/10/20154/10/2015 3:46:24 PM PART
Rear silt fence perimeter and erosion control blanket are in good condition and holding disturbed sediment in place.

Trackout and loose sediment on Strata Via. Need to sweep up street, gutter, and sidewalk.

Adjacent lot (empty) is being used for staging by both SFHs on Strata Via. Need general permit or remove and return to pre-existing conditions.

Will re-inspect next week.
ESC15-00210 Site Preparation4/9/20154/10/20154/10/2015 3:44:11 PMAPASS
ESC14-01035 General Inspection4/10/20154/10/20154/10/2015 1:42:14 PMPPART
Limits of distubance were expanded due to rerouting of rooftop storm drain to Windsong instead of Birdsong. Informed RP that they will need to re-grade the disturbed area and seed/plant natural vegetation for stabilization. He is aware and working with Public Works to meet requirements.

Correction:

Install wattle at base of disturbed area to prevent sediment migration down drainage.
ESC14-00135 General Inspection4/10/20154/10/20154/10/2015 1:23:30 PM PASS
WIP. No trackout to culdesac. No active earth work. Scheduled to be completed in May. No corrections at this time.
ESC14-00289 General Inspection4/10/20154/10/20154/10/2015 12:44:56 PM PASS
Landscaping crews finalizing tree and shrub installed. Slopes onsite have be hydroseeded with tacifier. Hillside vegetation bond has been settled. ESC permit conditions satisfied, no issues, permit finaled.
ESC14-00289 DOC - Permit Finaled4/10/20154/10/20154/10/2015 12:43:42 PMPPASS
ESC14-00284 General Inspection4/10/20154/10/20154/10/2015 12:43:27 PM PASS
No changes at site. No landscaping/stabilization has occured. No sediment leaving site.
ESC13-00755 General Inspection4/10/20154/10/20154/10/2015 12:23:20 PM PASS
No significant trackout from Terraces. Interior of site has considerably less loose dirt on paved surfaces due to periodic sweeeping efforts.

All receiving storm drains have drop inlet sediment protection. Parking lot for employes is still stabilized with rock mix. No fugitive dust observed at site, water truck on site to wet down roads/traffic areas through site.

No corrections requested at this time.
ESC14-01108 BMP Violation4/10/20154/10/20154/10/2015 12:01:56 PMPPART
No trackout or sediment leaving site. Washout performed on adajacent lot (owned by Lasher Construction).

RP on site. Verbal correction issued to clean up washout and have lined washout facility for next home. He agreed and will clean up today.
ESC13-00684 General Inspection4/10/20154/10/20154/10/2015 11:59:07 AM PASS
Antelope Springs SFHs are in progress with multiple contractors. Drop inlets have sediment protection and a significant amount of sand/sediment has collected in gutters.

Need to have street sweeper.

Also working with contractors to provide a lined washout pit or portable washout container.

No trackout or discharges offsite. Penn Canal is flowing, no erosion occuring on banks.
ESC14-00980 BMP Violation4/8/20154/10/20154/10/2015 11:49:04 AMAPASS
Check that washout was cleaned. Zach Evans site supervisor called to say that clean up would occur wednesday & thursday.

Illicit washout pile has been cleaned up and sidewalk swept. Site is now back in compliance.

Discussed provided lined washout or Ecopan for remaining Z. Evans projects in Antelope Springs.


ESC14-01036 Aging Inspection4/10/20154/10/20154/10/2015 10:24:52 AM PASS
WIP on home addition framing. ESC permit sign is posted. No dirt leaving site, no stockpiles with risk of sediment runoff. Site is in compliance.
ESC14-00200 General Inspection4/10/20154/10/20154/10/2015 9:34:22 AM PASS
Hydroseeded areas north of data center are growing well. No trackout or issues, will continue to monitor to ensure grass is established. No corrections.
ESC15-00407 Site Preparation4/9/20154/10/20154/10/2015 8:49:08 AMAPASS
Kyle Phone #: ###-####

Meet GC on site. Excavation to start later today. Permit posted. Will place sandbag in gutter at angle to trap sediment from site. Low traffic street. Existing vegetation along curb will be preserved. Approved for construction.
ESC15-00268 Site Preparation4/8/20154/10/20154/10/2015 8:05:55 AMACANC
Gary Phone #: ###-####

Rescheduled for Tuesday 4/14