Inspections for the day of: Monday, April 10, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02506 ELE-Aging Inspection4/10/20174/10/20174/11/2017 11:21:55 AM DONE
Drove by and inspected
ELE17-00992 Electrical Rough-In4/10/20174/10/20174/10/2017 2:52:22 PMPPASS
Phone #: ###-#### Inspection requested via web by Brad Girard
Wall rough in ok cover
ELE17-00991 Electrical Rough-In4/10/20174/10/20174/10/2017 2:42:41 PMPPASS
Phone #: ###-#### Inspection requested via web by Brad Girard
Wall rough in ok cover
ELE17-00985 Electrical Rough-In4/10/20174/10/20174/10/2017 1:39:15 PMPPASS
Please call Brad (###-####) 30 minutes ahead for access. Phone #: ###-#### Inspection requested via web by Brad Girard
Walls rough in ok cover
ELE17-00739 Electrical Rough-In4/10/20174/10/20174/10/2017 12:44:07 PMPPASS
NOTE - WE ARE REQUESTING A CEILING INSPECTION FOR THE 3RD FLOOR OF THE BLUE HERON BUILDING ONLY

THANK YOU AND HAVE A NICE DAY! Phone #: ###-#### Inspection requested via web by JENNY EMEL
3rd floor lobby grid rough in ok cover
ELE17-00037 Electrical Rough-In4/10/20174/10/20174/10/2017 10:58:16 AMAPASS
Rough In Inspection on Building #14
Contact Dan Hutchinson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Check on final 1411 junction box in ceiling in front of panel, ground splice out of box and wrong color. Rough in ok cover
ELE16-00580 Electrical Rough-In4/10/20174/10/20174/10/2017 10:15:50 AMAPASS
Ceiling inspection in garage area level 1 ; 2. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum
Area noted 1,2 garage ceilings and heat trace. Rough in ok to insulate.
ELE16-00580 Electrical Rough-In4/10/20174/10/20174/10/2017 10:15:24 AMPFAIL
Ceiling inspection in garage area level 1 ; 2. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum
Level 2 electrical room 212, brace for duct work in work space minimum for panels in room.
110.26- Minimum clear work space for voltage present is 30" wide, 36" deep, from floor to height of 6 1/2'.
Heat trace covered by this permit is roof and main water and drains. Fire sprinkler pipes heat trace installation said to be done by others, permit and licensing required.
ELE17-00968 Temporary Service4/7/20174/10/20174/10/2017 8:31:43 AMAPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat
t/s u/g n ok