Inspections for the day of: Monday, April 10, 2017.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM16-03382 PLM-Aging Inspection4/10/20174/10/20174/10/2017 3:43:33 PM PEND
tagged to call for an inspection
PLM16-04096 Final4/10/20174/10/20174/10/2017 2:55:42 PMPPASS
3255 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
PLM17-00501 Final4/9/20174/10/20174/10/2017 2:31:42 PMPFAIL
Phone #: ###-#### Inspection requested via web by Jason Gonzalez. The water heater pan must be at least 2" larger than the water heater diameter per manufacturers instructions. 1" clearance all the way around the heater.
MIS17-00104 PLM-Conference4/10/20174/10/20174/10/2017 2:07:33 PMPPART
Blimies unit 950. Found the kitchen and the 4" branch line that extends into unit 110 (Drug testing company,) are tied into the unit 950 grease interceptor. The plans show the 4" branch line should be tied into the main drain.
PLM16-02272 PLM-Aging Inspection4/10/20174/10/20174/10/2017 11:09:08 AM PEND
tagged door
PLM17-01080 Water Heater Final4/9/20174/10/20174/10/2017 10:00:09 AMAPASS
Phone #: ###-#### Inspection requested via web by curtis rowe
PLM17-01038 Final4/6/20174/10/20174/10/2017 9:45:04 AMAPASS
if possibly can you please perform inspection at 10 am Phone #: ###-#### Inspection requested via web by Marisa Hone
PLM17-00410 Plumbing Rough-in4/9/20174/10/20174/10/2017 9:12:24 AMAPASS
Phone #: ###-#### Inspection requested via web by Ben Decker