PLM16-03382
| PLM-Aging Inspection | 4/10/2017 | 4/10/2017 | 4/10/2017 3:43:33 PM | | PEND |
|
|
tagged to call for an inspection
|
PLM16-04096
| Final | 4/10/2017 | 4/10/2017 | 4/10/2017 2:55:42 PM | P | PASS |
|
|
3255 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-00501
| Final | 4/9/2017 | 4/10/2017 | 4/10/2017 2:31:42 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez. The water heater pan must be at least 2" larger than the water heater diameter per manufacturers instructions. 1" clearance all the way around the heater.
|
MIS17-00104
| PLM-Conference | 4/10/2017 | 4/10/2017 | 4/10/2017 2:07:33 PM | P | PART |
|
|
Blimies unit 950. Found the kitchen and the 4" branch line that extends into unit 110 (Drug testing company,) are tied into the unit 950 grease interceptor. The plans show the 4" branch line should be tied into the main drain.
|
PLM16-02272
| PLM-Aging Inspection | 4/10/2017 | 4/10/2017 | 4/10/2017 11:09:08 AM | | PEND |
|
|
tagged door
|
PLM17-01080
| Water Heater Final | 4/9/2017 | 4/10/2017 | 4/10/2017 10:00:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by curtis rowe
|
PLM17-01038
| Final | 4/6/2017 | 4/10/2017 | 4/10/2017 9:45:04 AM | A | PASS |
|
|
if possibly can you please perform inspection at 10 am Phone #: ###-#### Inspection requested via web by Marisa Hone
|
PLM17-00410
| Plumbing Rough-in | 4/9/2017 | 4/10/2017 | 4/10/2017 9:12:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker
|