Inspections for the day of: Monday, April 10, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00473 BLD-Framing/Rough-in4/10/20174/10/20174/10/2017 4:41:57 PMPPART
Pete-pod 2 and electric room and exterior facet in pod 4 Phone #: ###-#### Ok to insulate electrical room, need to complete column wraps. framing at pod soffits ok, ok to insulate.
BLD16-02650 BLD-Framing/Rough-in4/10/20174/10/20174/10/2017 3:50:02 PMPPASS
Ste 103 and 104 // Pat Phone #: ###-####. Units 103 and 104 only ok to insulate.
BLD16-03666 BLD-Framing/Rough-in4/10/20174/10/20174/10/2017 3:19:38 PMACANC
BLD16-03666 BLD-Framing/Rough-in4/10/20174/10/20174/10/2017 3:02:32 PMPPART
Ok to insulate exterior walls on rooms 134 to 142 only.
BLD16-04405 BLD-Final4/7/20174/10/20174/10/2017 2:16:40 PMPPASS
Brian Phone #: ###-####
BLD16-04405 DOC - Permit Finaled4/10/20174/10/20174/10/2017 2:16:30 PMPPASS
BLD17-00222 BLD-Framing/Rough-in4/10/20174/10/20174/10/2017 1:42:27 PMPNR
Jeff Phone #: ###-####. ok to insulate exterior walls. Provide city set of approved plans.
BLD17-00290 BLD-Final4/9/20174/10/20174/10/2017 10:59:09 AMAPART
Mike,

I have troy scheduled first to do the fire life safety inspection. He should be complete by 10am. I will be at the space at 9am to unlock.

Thanks,
Todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Ok to occupy east half only.
BLD16-03500 BLD-Framing/Rough-in4/7/20174/10/20174/10/2017 10:43:03 AMAFAIL
Troy Phone #: ###-####. Per engineering for tall wall, block all panel edges and nail with 8d. per schedule. Provide the 2x6 diagnorl trussing as per enginering on RV bay openings. Attach sheathing on north west wall and wall adjacent to main entry. Nail off the 2ply E03 and Do3 trusses per the truss engineeing. Install the missing lateral brace on E02 truss. Install beam across mech. opening to provide the required bearing for C08, C09 and C10 trusses. Provide header over door from garage to house. Install blocking at panel edges on portal frames in back and nail. Complete nailing of all portal frames- nails only. Complete install of hold downs, missing nuts. Correction notice posted.
MIS17-00101 BLD-Conference4/7/20174/10/20174/10/2017 10:25:20 AMAPASS
Checking for code compliance.. affordable home ownership loan with HCD.. Call Steve for entry half hour before. Eunice Phone #: ###-####. All issues have been repaired. ok.
BLD17-00489 BLD-Foundation4/7/20174/10/20174/10/2017 9:11:34 AMAPART
Please call ahead to meet for Foundation Wall - Chuck Phone #: ###-####
BLD16-02392 BLD-Other4/7/20174/10/20174/10/2017 8:51:03 AMAPASS
Manufactured home block ; tie inspection Phone #: ###-#### Inspection requested via web by Ashleigh Meligan. Block and tie ok.
BLD16-03448 BLD-Other4/7/20174/10/20174/10/2017 8:43:52 AMAPASS
Manufactured home block ; tie inspection Phone #: ###-#### Inspection requested via web by Ashleigh Meligan. Block and tie inspection.
BLD16-03446 BLD-Other4/7/20174/10/20174/10/2017 8:43:08 AMAPASS
Manufactured home final inspection Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
BLD16-03446 DOC - Permit Finaled4/10/20174/10/20174/10/2017 8:42:50 AMPPASS