FIR16-00512
| INSP-Sprinkler Rough-in/Hydro | 4/10/2017 | 4/10/2017 | 4/10/2017 12:53:22 PM | P | PASS |
|
|
First floor hydrostatic test complete
|
FIR17-00139
| INSP-Sprinkler Rough-in | 4/10/2017 | 4/10/2017 | 4/10/2017 9:55:43 AM | P | PASS |
|
|
Rough to cover inspection for area of work complete, area of work approved for cover.
|
FIR16-00299
| INSP-Sprinkler Rough-in/Hydro | 4/7/2017 | 4/10/2017 | 4/10/2017 9:55:03 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in hotel resident rooms on level 8 complete, hotel resident rooms on level 8 approved for cover. Rough in inspection complete for level 9, rough to cover inspection will be scheduled when pendant heads are installed.
|