ELE18-00904
| Electrical Rough-In | 4/10/2018 | 4/10/2018 | 4/10/2018 3:19:35 PM | P | PASS |
|
|
Paul Shreve''s is contact at ###-####. Ceiling Inspection. Phone #: ###-#### Inspection requested via web by Debby Pierce Ceilings only ok to cover
|
ELE18-00908
| Electrical Rough-In | 4/10/2018 | 4/10/2018 | 4/10/2018 2:16:32 PM | P | PASS |
|
|
Luanne Phone #: ###-#### Basement bathroom ok to cover
|
ELE18-01131
| Final | 4/10/2018 | 4/10/2018 | 4/10/2018 2:16:07 PM | P | PASS |
|
|
This is at Hawthorne Elementary School ran power to new furnace in attic and A/C outside all surface conduit. You will need to call Greg Palmer at ###-#### he works for me to meet you there and show you what we did. He will be about 10 minutes away at another job in the area. Thanks. Phone #: ###-#### Inspection requested via web by robert feller Final ok
|
ELE17-03778
| Electrical Rough-In | 4/10/2018 | 4/10/2018 | 4/10/2018 12:42:35 PM | P | PASS |
|
|
Wall rough in deli Phone #: ###-#### Inspection requested via web by Shane Lott Deli wall ok to cover
|
ELE18-00701
| Permanent Service | 4/10/2018 | 4/10/2018 | 4/10/2018 12:42:10 PM | P | PASS |
|
|
Service Upgrade. Need inspection before ID Power will disconnect power for the swap. David ###-#### or Justin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg p/s o/h rec ok
|
ELE18-01022
| Final | 4/9/2018 | 4/10/2018 | 4/10/2018 12:13:38 PM | P | FAIL |
|
|
Please call Shawn when you are on your way in order for him to meet you there ###-####. Please note he will not be available until after 11:00 a.m. Phone #: ###-#### Inspection requested via web by Eric Schroeder AFC calc as discussed required for final
|
ELE18-00927
| Electrical Rough-In | 4/6/2018 | 4/10/2018 | 4/10/2018 11:26:01 AM | A | PASS |
|
|
Inspection for rough-in cover. Phone #: ###-#### Inspection requested via web by Scott Campbell Walls only and u/g for floor boxes only ok to cover
|
ELE18-01056
| Final | 4/9/2018 | 4/10/2018 | 4/10/2018 11:00:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyla Page Final for solar array system ok
|
ELE18-01056
| Electrical Rough-In | 4/9/2018 | 4/10/2018 | 4/10/2018 10:57:00 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kyla Page Solar array u/l listing
|
ELE18-00450
| Electrical Rough-In | 4/9/2018 | 4/10/2018 | 4/10/2018 10:17:56 AM | A | PASS |
|
|
We are requesting an underground inspection for tomorrow morning. Our onsite contact is Rod @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate u/g for parking lot lights ok to cover
|
ELE17-04374
| Final | 4/3/2018 | 4/10/2018 | 4/10/2018 9:58:56 AM | A | FAIL |
|
|
Josh will be there ###-####. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan No one on site
|
ELE18-01093
| Rough-In Permanent Service | 4/9/2018 | 4/10/2018 | 4/10/2018 9:19:35 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn BCO remove all insulation and caulking on boxes Foam sealing done proir to inspection
|