PLM96-00126
| INSP - Plumbing Rough-in | 4/10/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | A | PASS |
|
|
04/10/96 347 - e/5-e/6 r/i o/k THIS COMPLETE'S THE ROUGH IN ON THIS PERMIT 4/11/6 347
|
PLM96-00645
| INSP - Plumbing Rough-in | 4/11/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | P | PASS |
|
|
04/11/96 347 - 9 fixtures W/C 2 BASIN 1 TUB 2 SINK 1 W/B 1 W/H 1 R/I O/K 4/11/6 347 (2)
|
PLM96-00853
| INSP - Sprinkler & Backflow | 4/11/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | P | PASS |
|
|
04/11/96 347 - SP. O/K 4/11/6 347
|
PLM96-00854
| INSP - Sewer and Water lines | 4/11/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | P | PASS |
|
|
04/11/96 347 - S&W O/K 4/11 6 347
|
PLM95-01249
| INSP - Water lines | 4/11/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | P | PASS |
|
|
04/11/96 347 - W/L O/K 4/11/6 347
|
PLM96-00051
| INSP - Final | 4/11/1996 | 4/11/1996 | 4/11/1996 12:00:00 AM | P | PASS |
|
|
04/11/96 347 - FINAL O/K W/C 3 BASIN 4 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 4/11/6 347
|