Inspections for the day of: Friday, April 11, 1997.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-00519 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AM PASS
/ / 350 - final, signed card
MEC97-00519 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AM PASS
/ / 350 - final, signed card
MEC97-00913 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AM FAIL
/ / 350 - no final, corrections posted in kitchen window
MEC97-00913 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AM FAIL
/ / 350 - no final, corrections posted in kitchen window
BLD97-00516 INSP - Framing/Rough-in4/11/19974/11/19974/11/1997 12:00:00 AM PASS
/ / 350 - frame ok, ok insulate
BLD96-01738 INSP - Foundation4/10/19974/11/19974/11/1997 12:00:00 AMAPASS
04/11/97 350 - FND. REBAR ok, as per plan and specs
BLD97-00186 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMACANC
FOR C/O
MEC97-00921 INSP - Rough-in & Gas Pressure4/10/19974/11/19974/11/1997 12:00:00 AMAPASS
04/11/97 350 - r/i ok, pt ok
MEC97-00922 INSP - Rough-in & Gas Pressure4/10/19974/11/19974/11/1997 12:00:00 AMAPASS
04/11/97 350 - r/i ok, pt ok
MEC97-00927 INSP - Rough-in & Gas Pressure4/10/19974/11/19974/11/1997 12:00:00 AMAFAIL
04/11/97 350 - no address, no inspection
MEC96-03279 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMACANC
04/11/97 350 - fire job to be done by #337
MEC96-03279 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMACANC
04/11/97 350 - fire job to be done by #337
MEC97-00519 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMANR
04/11/97 350 - 1st floor union block not ready check p.m.
MEC97-00519 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMANR
04/11/97 350 - 1st floor union block not ready check p.m.
MEC97-00652 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AMPPASS
04/11/97 350 - garage door and front door will be open final
MEC97-00652 INSP - Final4/11/19974/11/19974/11/1997 12:00:00 AMPPASS
04/11/97 350 - garage door and front door will be open final
MEC97-00928 INSP - Rough-in & Gas Pressure4/11/19974/11/19974/11/1997 12:00:00 AMPFAIL
04/11/97 350 - no address, no inspection
MEC97-00929 INSP - Retro Fit (check note)4/11/19974/11/19974/11/1997 12:00:00 AMPPASS
04/11/97 350 - THIS IS FOR LATE PM PLEASE furn. ok, pt ok, final
MEC97-00932 INSP - Gas pressure test4/11/19974/11/19974/11/1997 12:00:00 AMPCANC
04/11/97 350 - called and canceled
BLD97-00239 INSP - Energy code compliance4/11/19974/11/19974/11/1997 12:00:00 AMPPASS
04/11/97 350 - insulation ok, ok to cover
BLD97-00294 INSP - Framing/Rough-in4/11/19974/11/19974/11/1997 12:00:00 AMPFAIL
04/11/97 350 - corrections on frame, need brace panels, will use interio
BLD97-00516 INSP - Framing/Rough-in4/10/19974/11/19974/11/1997 12:00:00 AMPPASS
04/11/97 350 - frame ok, ok to insulate
BLD97-00186 INSP - Final4/10/19974/11/19974/11/1997 12:00:00 AMPCANC
04/11/97 350 - LATE P.M. canceled til monday
BLD97-00801 INSP - Framing/Rough-in4/11/19974/11/19974/11/1997 12:00:00 AMPCANC
04/11/97 350 - to be done by #340