Inspections for the day of: Tuesday, April 11, 2000.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-00810 BLD-Final4/10/20004/11/20004/11/2000 12:00:00 AMAFAIL
###-#### hand rails not code comlient. 4/11/00
MIS00-00060 BLD-Final4/7/20004/11/20004/11/2000 12:00:00 AMAPASS
###-#### or ###-#### Carolle Can you call first house move form delivered to dan overy bond set at 7000.00 for lot clean up and relocate of bldg. 4/11/00
BLD00-00572 BLD-Footing4/10/20004/11/20004/11/2000 12:00:00 AMAPASS
###-#### placed with special insp. pending reportr. 4/11/00
BLD00-00802 BLD-Footing4/10/20004/11/20004/11/2000 12:00:00 AMAPART
Terry Stoddard ###-#### placed with out inspection no plans or p/l located at site. 4/11/00
BLD00-00327 BLD-Final4/10/20004/11/20004/11/2000 12:00:00 AMAPASS
###-####
MIS00-00061 BLD-Conference4/11/20004/11/20004/11/2000 12:00:00 AMAPART
Occupancy violation notice sent by registered mail to owners.
BLD00-00683 BLD-Footing4/10/20004/11/20004/11/2000 12:00:00 AMPPART
ryan ###-#### recieved engineer approval of footing site grade. 3500 psi concrete spec. on engineering. contractor to get special insp. or have engineer change design submit to bldg. dept... 4/11/00
BLD00-00683 BLD-Footing4/10/20004/11/20004/11/2000 12:00:00 AMPPART
ryan ###-#### recieved engineer approval of footing site grade. 3500 psi concrete spec. on engineering. contractor to get special insp. or have engineer change design submit to bldg. dept... 4/11/00
BLD99-01720 BLD-Framing/Rough-in4/10/20004/11/20004/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####. mlb to i beam in grage area to have engineered fix for wrong atchment aplacation per simpson book/ need wall type designation for staair encloser not listed on approved drawing. 4/12/00
BLD99-01720 BLD-Framing/Rough-in4/10/20004/11/20004/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####.
BLD99-03693 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPFAIL
Bob ###-####
BLD99-03693 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPNR
Bob ###-####
BLD99-03446 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2000 at 08:39:55. Contact: ###-####.
BLD99-03446 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2000 at 08:39:55. Contact: ###-####.
BLD99-02746 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/11/2000 at 09:51:19. Contact: ###-####. need fire inspection sign off. 4/11/00
BLD99-02746 BLD-Final4/11/20004/11/20004/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/11/2000 at 09:51:19. Contact: ###-####. need fire inspection sign off. 4/11/00
BLD99-02727 BLD-Foundation4/11/20004/11/20004/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2000 at 10:06:54. Contact: ###-####. walls ok rebar and hold downs. 4/11/00
BLD99-02727 BLD-Foundation4/11/20004/11/20004/11/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2000 at 10:06:54. Contact: ###-####. walls ok rebar and hold downs. 4/11/00