PLM99-03196
| Final | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
Jim Jensen ###-####
|
PLM00-00960
| Plumbing Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 11:43:20. Contact: ###-####.
|
PLM00-00405
| Final | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 12:00:56. Contact: ###-####. no access 4/11/00
|
PLM00-01034
| Water and/or Sewer | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
JOHN ###-#### SWR LINE
|
PLM00-01035
| Water and/or Sewer | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
JOHN ###-#### SWR LINE
|
PLM00-01042
| Sprinkler (Final) | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PART |
|
|
JAY --###-####---CHECK THE TIE-INS TO THE WATER MAIN tie in only ok 4/11/00
|
PLM00-00533
| Final | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-01044
| Sprinkler (Final) | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
Benjamin ###-####
|
PLM99-03830
| Plumbing Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 17:02:00. Contact: ###-####.
|
PLM99-03905
| Plumbing Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 330 On 4/10/00 insulation in mech. room fail get insulation behind all piping in exterior wall r 13 min. 4/11/00
|
PLM99-01172
| Final | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 4/10/00 charlie ###-#### 600 robins rd. temp occ 2nd and 3rd floors grids 6 thru 12 no patient rooms 4/12/00
|
BLD00-00048
| BLD-Conference | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 4/11/00 engineer to resubmit site plan showing 8" sewer instead of 21" sewer, grade apx .5%
|
PLM00-01053
| Water and/or Sewer | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 4/11/00 sewer and water
|
PLM00-01045
| Groundwork | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 08:24:32. Contact: ###-####. no test door not open 4/12/00
|
PLM00-01047
| Plumbing Rough-in | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
###-#### water system test failed 4/12/00
|
PLM00-00428
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
###-#### lock code is 6677 enter on garage no final till sprinkler is complete 4/12/00
|
PLM00-00937
| Groundwork | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 09:15:18. Contact: ###-####. 1st 4 sewers water lines need testing 4/12/00
|
PLM00-01054
| Sprinkler (Final) | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-01056
| Plumbing Rough-in | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-01019
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PART |
|
|
###-#### interceptor and related piping 4/12/00
|
PLM97-02415
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
Homeowner someone will contact you about a sign off on an addition jim --###-#### seems this was covered without a ri inspection every thing seems to be working fine and up to code from what i can see 4/12/00
|
PLM00-00996
| Water and/or Sewer | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
###-#### sewer 4/12/00
|
PLM00-01022
| Sprinkler (Final) | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 330 On 4/10/00 ###-#### 4/10/00 expose connections 4/12/00
|