BLD00-00500
| BLD-Framing/Rough-in | 4/7/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
###-#### Cancel per contractor 4/11/00 1:56:52 PM
|
BLD00-00500
| BLD-Energy code compliance | 4/7/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
Cancel per contractor 4/11/00 1:57:04 PM
|
BLD00-00456
| BLD-Framing/Rough-in | 4/7/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
###-#### Cancel per contractor 4/11/00 1:57:28 PM
|
BLD00-00456
| BLD-Energy code compliance | 4/7/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
cancel per contractor 4/11/00 1:57:37 PM
|
MEC99-03157
| Final | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | FAIL |
|
|
Jim Jensen ###-#### Dryer vent used alternative method but does comply with termination size increase not insulated 4/11/00 1:56:21 PM
|
BLD00-00222
| BLD-Framing/Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
russell ###-#### Was done on 4/10/00 4/11/00 1:56:34 PM
|
MEC00-01124
| Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
###-####-MERLE R/I
|
BLD00-00545
| BLD-Framing/Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 15:40:24. Contact: ###-####. Need to recall 4/11/00 1:57:16 PM
|
BLD97-00878
| BLD-Conference | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 16:03:57. Contact: ###-####.
|
BLD00-00699
| BLD-Footing | 4/10/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PASS |
|
|
jack ###-####
|
BLD00-00362
| BLD-Energy code compliance | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PART |
|
|
Note,engineer has approved rear house rear wall, ok to sheetrock house waiting for engineers approval for rear garage door.I meet with contractor this morning 407.
|
BLD99-03332
| BLD-Wall cover | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | A | PART |
|
|
ok to side engineer will be on site this afternoon to review upper floor shear wall at bonus room.
|
BLD00-00802
| BLD-Foundation | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
|
MEC00-00571
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 08:05:17. Contact: ###-####. Called no answer. Crawl space no access 4/12/00 10:22:12 AM
|
BLD00-00749
| BLD-Foundation | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 08:12:01. Contact: ###-####. About 50% complete appears ok 4/12/00 10:22:23 AM
|
MEC00-00613
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 09:41:49. Contact: ###-####. Unable to do this today 4/12/00 10:22:00 AM
|
MEC00-00616
| Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 09:42:55. Contact: ###-####. Unable to do this today 4/12/00 10:21:53 AM
|
BLD99-03718
| BLD-Energy code compliance | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PART |
|
|
Tradewinds Phyillis ###-#### Still has frame corrections not approved for lower 4/12/00 10:22:58 AM
|
MEC00-01136
| Rough-in | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Flue clearance/foil tape dryer vent 4/12/00 10:22:42 AM
|
BLD00-00241
| BLD-Energy code compliance | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
###-#### C/N still posted for frame inspection 4/12/00 10:23:28 AM
|
BLD00-00241
| BLD-Framing/Rough-in | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | FAIL |
|
|
C/N still posted 4/12/00 10:23:35 AM
|
BLD99-00810
| BLD-Final | 4/11/2000 | 4/11/2000 | 4/11/2000 12:00:00 AM | P | PASS |
|
|
###-#### Rear deck included, note inside handrails appears temporary. 4/12/00 10:23:17 AM
|