BLD01-00715
| BLD-Foundation | 4/10/2001 | 4/11/2001 | 4/12/2001 12:00:00 AM | A | PART |
|
|
RALPH ###-#### ; poured 4/12/2001 11:42:00 AM
|
BLD01-00229
| BLD-Footing | 4/10/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 10:56:33. Contact: ###-####...ftg poured, 4/11/2001 12:27:14 PM
|
MEC01-01003
| Conference | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 4/11/2001 9:48:42 AM w/ eng'r for Kemper refrig Albertson's eng'r & contractor...will submit for change of configuration of machinery room. 4/11/2001 10:51:12 AM
|
BLD00-03659
| BLD-Conference | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/11/2001 10:58:00 AM w/ Albertsons & refrig. eng'rs, contractor, & subs...went over c/n of 4-5 re machinery room, special insp req'd, & exits. Will resubmit for change to mach. rm.
|
BLD00-03611
| BLD-Final | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | FAIL |
|
|
buck ###-####; c/n signage, handrail, other final; fire insp onsite...pendi 4/11/2001 3:31:44 PM ng his ok for t/o 4/11/2001 3:31:56 PM
|
BLD00-00514
| BLD-Final | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PART |
|
|
###-####;keep c/n, all items ok except fire final and ext finish/glazing; rec'd eng's letter and affidavit ok for t/o 4/11/2001 3:33:31 PM
|
BLD00-01649
| BLD-Conference | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/11/2001 5:39:12 PM rec'd curtain wall firestop detail
|
BLD00-00732
| BLD-Conference | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/11/2001 5:42:00 PM w/ bldr: eng'r reviewing options for substitute shear wall at front of mezz.
|
BLD99-03383
| BLD-Framing/Rough-in | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/11/2001 5:44:30 PM 2nd fl curtain wall firestops at north & east sides ok per detail; wip for shafts, & corridor walls
|
BLD00-03085
| BLD-Final | 4/10/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 14:32:25. Contact: ###-####. ok to sign at office for l/c..card not at site when insp'd 4/11/2001 3:30:42 PM
|
BLD00-02964
| BLD-Final | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PASS |
|
|
###-#### call first to meet there , card not onsite, c/n ok, ok for c/o 4/11/2001 5:04:13 PM
|
BLD00-00771
| BLD-Framing/Rough-in | 4/11/2001 | 4/11/2001 | 4/11/2001 12:00:00 AM | P | PART |
|
|
###-####; office area ok; need submittal & cert of value per discussion 4/11/2001 5:40:34 PM
|