Inspections for the day of: Wednesday, April 11, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01032 Pressure Test4/10/20014/11/20014/11/2001 12:00:00 AMAPASS
Ken ###-####
MEC01-01032 Final4/10/20014/11/20014/11/2001 12:00:00 AMAPASS
ken ###-####
BLD01-00213 BLD-Framing/Rough-in4/10/20014/11/20014/11/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/10/2001 at 17:23:58. Contact: ###-####. ok to cover ext, still need ele installed and inspected prior to inside cover. 4/11/2001 11:51:32 AM
BLD00-03194 BLD-Footing4/10/20014/11/20014/11/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/10/2001 at 18:19:57. Contact: ###-####.subject to s-i. 4/11/2001 4:08:35 PM
BLD00-01979 BLD-Framing/Rough-in4/11/20014/11/20014/11/2001 12:00:00 AMPPART
ceiling grid Shane ###-#### all comon grid ok ,need to support the prestige grid at the ends. 4/11/2001 2:20:13 PM
BLD00-03351 BLD-Other4/11/20014/11/20014/11/2001 12:00:00 AMPFAIL
Added by Inspector: 407 On 4/11/2001 1:38:00 PM talked with owner on site, went over job card and requirements for obtaining a c/o , issued a c/n stating a certificate of occupancy has not been issued for the space, and posted red sticker( violation of Boise City Code #4-2-10:).
MEC01-01020 Final4/11/20014/11/20014/11/2001 12:00:00 AMPFAIL
Added by Inspector: 407 On 4/11/2001 4:10:06 PM b-vent clearnce,need vent termination requirements,also if ok as done needs exterior support. c/n posted.