BLD01-02346
| BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 14:44:41. Contact: ###-####.need new detail eng sent wrong wall section. 4/11/2002 10:48:25 AM
|
BLD01-02193
| BLD-Final | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | PART |
|
|
###-#### janette . Ok for a temp , only needs to complete earth work trenches, grading. 4/11/2002 11:21:41 AM
|
BLD02-00794
| BLD-Footing | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 16:16:00. Contact: ###-####.Appears ok no details shown on plans for footing, not not required for less than 400 sq ft. 4/11/2002 12:11:14 PM
|
BLD02-00203
| BLD-Final | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | NR |
|
|
###-#### BRETT . needs electrical final prior to calling for a bld final. 4/11/2002 11:46:21 AM
|
BLD02-00457
| BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | FAIL |
|
|
###-#### *2684 gate access. C/N posted, Do not side.Went over items with contractor, truss problems as well as engineering. Engineer should review on site,as well as truss company. 4/11/2002 4:00:50 PM
|
BLD02-00834
| BLD-Footing | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | PART |
|
|
###-#### TIM . c/n posted identify property line . called contractor he said it was done, can verify at wall inspection. 4/11/2002 5:19:16 PM
|
BLD01-02793
| BLD-Final | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | NR |
|
|
###-#### GARY . needs mec,ele,plm, and grading signed off,prior to calling for a final. 4/11/2002 5:10:40 PM
|
MEC01-03760
| Final | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 10:34:21. Contact: ###-####.. unable to gain access due to wet floors. 4/11/2002 5:08:19 PM
|
BLD02-00499
| BLD-Final | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### late pm. OK plumbing approved. 4/11/2002 4:19:52 PM
|