Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-01576 FIRE-Final Inspection4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 4/10/2002 9:35:51 AM
BLD02-00063 FIRE-Final Inspection4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
###-#### dryer vent penetrates floor ceiling assembly; not per the plans - mech has final pass; AHU for this space has detector for shutdown and worked properly 4/11/2002 10:26:58 AM
BLD96-02600 FIRE-Conference4/11/20024/11/20024/11/2002 12:00:00 AMAPART
Added by Inspector: 409 On 4/11/2002 10:30:31 AM met with John Wheeler and the 4 inch foam proportioner was installed per changes of the clacl'd area. Foam system still requires the annual test; will not final this permit until the foam test has been completed and the system proves to work properly
FIR01-00495 INSP-Final Inspection4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 4/11/2002 11:14:26 AM
BLD01-01647 FIRE-Final Inspection4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 4/11/2002 3:17:13 PM
FIR02-00072 INSP-Final Inspection4/11/20024/11/20024/11/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/11/2002 at 08:20:23. Contact: ###-####. need knox box, sign on back door 4/11/2002 2:12:48 PM
BLD02-00270 FIRE-Final Inspection4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
###-#### talked to tenant and GC and told them to get the address problem corrected with PDS to correct the permit problem 4/11/2002 3:18:15 PM
BLD01-00675 FIRE-Final Inspection4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
###-####