Inspections for the day of: Thursday, April 11, 2002.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00286 BLD-Framing/Rough-in4/11/20024/11/20024/11/2002 12:00:00 AM CANC
BLD01-03179 BLD-Final4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
###-#### ALAN c. of c. #22183 issued. 4/11/2002 10:28:23 AM
BLD01-03133 BLD-Final4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
TROY ###-#### OR OFFICE ###-#### CODE - 7550 c. of c. #22182 issued. 4/11/2002 8:59:57 AM
BLD02-00608 BLD-Foundation4/10/20024/11/20024/11/2002 12:00:00 AMAPART
###-#### wip--Notified builder that revised documents needed from office prior to framing inspection--building increased in size from approved plans. 4/11/2002 11:40:33 AM
BLD01-03225 BLD-Footing4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
###-#### nick Per plans-Building outside footing--not interior or columns. 4/11/2002 11:39:12 AM
MEC02-00550 Rough-in4/10/20024/11/20024/11/2002 12:00:00 AMAPASS
###-#### chris
MEC02-00942 Final4/11/20024/11/20024/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/11/2002 at 06:01:30. Contact: ###-####. c/n--1" clearance to combustibles required (at vent). 4/11/2002 8:32:37 AM
BLD01-03258 BLD-Final4/11/20024/11/20024/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/11/2002 at 06:55:54. Contact: ###-####. C/notice on site 4/11/2002 9:33:11 AM
BLD02-00353 BLD-Framing/Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/11/2002 at 07:24:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/11/2002 at 07:44:38.
MEC02-00960 Pressure Test4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
###-####
BLD02-00451 BLD-Framing/Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPFAIL
###-#### scott sheer inspect c/n posted--do not side 4/11/2002 2:59:00 PM
BLD02-00358 BLD-Framing/Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPPART
sheer inspect ###-#### terry Ok to side 4/11/2002 1:16:00 PM
BLD02-00286 BLD-Framing/Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPPART
TROY ###-#### OFFICE ###-#### C/N--ok to insulate. 4/11/2002 3:13:10 PM
MEC02-00943 Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/11/2002 at 09:16:00. Contact: ###-####. c/n posted on site. 4/11/2002 1:58:29 PM
MEC02-00943 Pressure Test4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 09:16:21. Contact: ###-####.
MEC02-00309 Final4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 10:45:09. Contact: ###-####.
MEC02-00283 Final4/11/20024/11/20024/11/2002 12:00:00 AMPPASS
###-#### greg
MEC02-00887 Rough-in4/11/20024/11/20024/11/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/11/2002 at 11:08:04. Contact: ###-####. 4/11/2002 3:11:16 PM Wrong house, wrong permit etc.. Existing home--homeowner did not require an inspection. call contractor to inform. 4/11/2002 3:25:24 PM