BLD01-03170
| BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | FAIL |
|
|
###-#### no city aprv plans or truss engin on site no inspection done 4/11/2002 9:45:40 AM
|
MEC02-00588
| Final | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | FAIL |
|
|
###-#### MARK ..north of ustick on cloverdale..right on musket 4/11/2002 8:37:05 AM gas piping needs to be tied down and pressure tested B vent needs 1 inch clearance in attic 4/11/2002 10:38:51 AM
|
MEC02-00938
| Pressure Test | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02279
| BLD-Final | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | A | NR |
|
|
###-#### needs drive way poured needs hillside ord singoff no inspection done at this time talked with johny he will get going on these item and reschedule final 4/11/2002 9:25:09 AM
|
BLD02-00717
| BLD-Framing/Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | FAIL |
|
|
###-#### dennis needs to add stapels to shear panels tie dbl top plateswith a strap add sleepers to over build seal around bottom plate nail old truss into new hangers ok to insulate 4/11/2002 2:37:55 PM
|
BLD02-00668
| BLD-Footing | 4/11/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | CANC |
|
|
###-#### LOGAN
|
BLD02-00474
| BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 15:41:48. Contact: ###-####.ok to cover int walls after elec r/i is passed 4/11/2002 4:05:35 PM
|
BLD02-00455
| BLD-Wall cover | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 13:35:21. Contact: ###-####. shear ok to cover ext walls 4/11/2002 2:34:53 PM
|
BLD02-00171
| BLD-Final | 4/10/2002 | 4/11/2002 | 4/11/2002 12:00:00 AM | P | FAIL |
|
|
###-#### MARK landing out bedroom door not 36 inchs seal ext wall outlet boxes smoke detectors in bedrooms 4/11/2002 10:40:25 AM
|