FIR02-00503
| FIR-Aging Inspection | 4/11/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | | PART |
|
|
talked to Earl and he said they are waiting on the elevator company to provide the control 4/11/2003 4:00:47 PM
|
FIR03-00068
| INSP-Sprinkler Rough-in | 4/8/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | A | FAIL |
|
|
MIKE ###-#### need additional EQ in three areas; see plans for exact locations 4/11/2003 9:51:36 AM
|
FIR03-00071
| INSP-Supply line flush | 4/10/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/10/2003 at 8:55:42 AM. Contact: ###-####. r/i of UG okay; still need to flush 4/11/2003 9:47:10 AM
|
FIR02-00005
| INSP-Sprinkler Rough-in/Hydro | 4/10/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | P | PART |
|
|
SAM ###-#### area A and C on third floor hydro okay 4/11/2003 3:44:29 PM
|
FIR03-00094
| INSP-Final Inspection | 4/11/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | P | NR |
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs remote LED stays lit all of the time 4/11/2003 3:44:01 PM
|
FIR03-00068
| INSP-Sprinkler Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | P | PART |
|
|
area B on first floor okay to cover 4/11/2003 3:43:37 PM
|
BLD02-00090
| FIRE-Sprinkler Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 12:00:00 AM | P | PART |
|
|
area B on first floor okay to cover
|