ELE05-01207
| Permanent Service | 4/11/2005 | 4/11/2005 | 4/11/2005 4:00:55 PM | P | FAIL |
|
|
richard - ###-#### - Note: electrical panel in garage corrections nec110.26(A) in front of panal boise city 2 ground rods 6ft or more apart connected together & to panal
|
ELE05-00696
| Final | 4/11/2005 | 4/11/2005 | 4/11/2005 3:57:09 PM | P | PASS |
|
|
Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok final
|
ELE05-01206
| Final | 4/11/2005 | 4/11/2005 | 4/11/2005 3:56:38 PM | P | PASS |
|
|
chris -- ###-#### ok final inspection done ele05-00696
|
ELE05-01206
| Rough-In Permanent Service | 4/11/2005 | 4/11/2005 | 4/11/2005 3:55:49 PM | P | PASS |
|
|
###-####- chris-- inspections done on ele05-00696 p/s u/g reconnect ok
|
ELE05-01116
| Electrical Rough-In | 4/11/2005 | 4/11/2005 | 4/11/2005 3:06:15 PM | P | PASS |
|
|
ann -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok cover ri correction nec210.52(A)(1&2) 2ft wall spacing in bedrooms 1&2 -- 12ft wall spacing in master bedroom can be done with floor outlets or cabinets
|
ELE05-00716
| Electrical Rough-In | 4/8/2005 | 4/11/2005 | 4/11/2005 12:43:18 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 3:02:41 PM. Contact: ###-####. ok cover front public area ceiling only
|
ELE05-01188
| Rough-In Permanent Service | 4/8/2005 | 4/11/2005 | 4/11/2005 10:15:55 AM | A | PASS |
|
|
###-#### ok cover ri p/s u/g n ok
|
ELE04-03930
| Final | 4/8/2005 | 4/11/2005 | 4/11/2005 9:53:32 AM | A | PART |
|
|
Final of Executive office area; Phone #: ###-#### Internet Inspection Request from: Paul Cook ok temp occ. still question on low voltage listings
|
ELE05-01183
| Rough-In Permanent Service | 4/8/2005 | 4/11/2005 | 4/11/2005 9:52:13 AM | A | PASS |
|
|
call 1st before insp --seth-per mike k at 8??; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok cover ri note permit was state so underground was done at that time. p/s u/g n ok
|