Inspections for the day of: Tuesday, April 11, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00278 FIR-Aging Inspection4/11/20064/11/20064/17/2006 3:23:26 PM DONE
Scheduled for final.
BLD04-00949 FIRE-Final Inspection4/11/20064/11/20064/11/2006 5:46:13 PMPFAIL
Fire alarm and fire sprinkler permits associated with this project must be inspected and approved previous to a life safety final inspection.
FIR05-00667 INSP-Sprinkler Rough-in/Hydro4/11/20064/11/20064/11/2006 5:42:52 PMPDEFR
Scheduled by a contractor via Hello! on 4/11/2006 at 8:37:28 AM. Contact: ###-####.
FIR06-00156 INSP-Final Inspection4/11/20064/11/20064/11/2006 5:42:38 PMPDEFR
Scheduled by a contractor via Hello! on 4/11/2006 at 8:35:37 AM. Contact: ###-####.
FIR05-00174 INSP-Final Inspection4/11/20064/11/20064/11/2006 5:36:25 PMPPASS
UG permit finaled.
FIR05-00405 INSP-Final Inspection4/11/20064/11/20064/11/2006 5:33:50 PMPPASS
Required corrections are complete, permit finaled.
FIR05-00272 INSP-Sprinkler Rough-in4/10/20064/11/20064/11/2006 5:30:05 PMPCANC
No time available for this inspection today, to be rescheduled per agreement with contractor.
FIR06-00248 INSP-Final Inspection4/11/20064/11/20064/11/2006 5:28:38 PMPPASS
Fire alarm tested satisfactory, inspection passed.
FIR06-00149 INSP-Sprinkler Rough-in4/10/20064/11/20064/11/2006 4:01:58 PMPPART
Overhead rough-in is good for cover, field modifications such as added heads at some locations due to obstructions which do not show on the approved plan must be reflected on as-built drawings, be aware of possible light fixture obstructions at some areas, UG supply line flush performed satisfactory.
FIR06-00053 INSP-Supply line flush4/7/20064/11/20064/11/2006 3:17:01 PMPDEFR
No time available to complete this inspection today, to be rescheduled per conversation with contractor.
FIR05-00449 INSP-Alarm Testing4/10/20064/11/20064/11/2006 3:15:43 PMAFAIL
Detection and notification devices tested on the 5th and 6th floors today, voice evac failed to function properly, ID, SD and manual pulls tested okay, need to date batteries in the 6th floor nac panel, elevator lobby smokes not tested at this time.
FIR05-00804 INSP-Final Inspection4/10/20064/11/20064/11/2006 11:50:20 AMAPASS
Fire alarm functioned properly, inspection passed.
FIR05-00712 INSP-Final Inspection4/10/20064/11/20064/11/2006 11:34:39 AMPCANC
Forrest, We like to schedule for 1:30 again to finish this off. Any questions call us.; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
FIR05-00405 INSP-Final Inspection4/10/20064/11/20064/11/2006 10:30:49 AMANR
Permit not ready for final pending project related alarm work.
BLD05-02631 FIRE-Final Inspection4/10/20064/11/20064/11/2006 10:24:41 AMAPASS
Life safety inspection satisfactory for vanilla finish, contractor to install visual lock indicator at the main entry/exit today as discussed.
BLD05-03067 FIRE-Final Inspection4/10/20064/11/20064/11/2006 10:22:31 AMAPASS
Items on previous inspection correction notice have been completed as required, project related alarm and sprinkler permits are finaled, life safety passed.