MEC08-00943
| Pressure Test | 4/11/2008 | 4/11/2008 | 4/11/2008 4:27:32 PM | P | PASS |
|
|
PHONE# IS TO CUSTOMER Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe 20#
|
MEC08-00943
| Final | 4/11/2008 | 4/11/2008 | 4/11/2008 4:27:15 PM | P | PASS |
|
|
PHONE# IS TO JIM''S HEAT Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
|
MEC08-01084
| Final | 4/11/2008 | 4/11/2008 | 4/11/2008 3:36:56 PM | P | PASS |
|
|
ALAN LATE PM IF POSSIBLE THANKS Phone #: ###-#### Internet Inspection Request from: Bill Burch 20#
|
MEC08-01054
| Pressure Test | 4/9/2008 | 4/11/2008 | 4/11/2008 3:36:20 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
|
MEC08-00930
| Final | 4/11/2008 | 4/11/2008 | 4/11/2008 3:35:18 PM | P | PASS |
|
|
PHONE# IS TO JIM''S HEAT, UNIT #77 Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
|
MEC08-00947
| Rough-in | 4/11/2008 | 4/11/2008 | 4/11/2008 2:53:47 PM | P | FAIL |
|
|
Pls call Charlie w/any questions. Thanks. Phone #: ###-#### Internet Inspection Request from: 4 Seasons fireplace clearances, b-vent terminate 8' from wall
|
MEC08-00882
| Final | 4/7/2008 | 4/11/2008 | 4/11/2008 2:17:43 PM | P | PASS |
|
|
rescheduled-3rd time, Ms. Pincock says shes super sorry for missing you the last time. She totally spaced off the appointment. Phone #: ###-#### Internet Inspection Request from: Yolanda Morris
|
MIS08-00069
| MEC-Conference | 4/10/2008 | 4/11/2008 | 4/11/2008 2:16:56 PM | A | FAIL |
|
|
per lee left c/n with owner in regards to chimney at roof
|
MEC08-00309
| Rough-in | 4/10/2008 | 4/11/2008 | 4/11/2008 1:17:39 PM | A | PASS |
|
|
Need Troy to ispect grease duct fire wrap on the roof. Call Russ @ ###-#### Phone #: ###-#### Internet Inspection Request from: misty evans ok to cover duct shaft at roof
|
MEC08-01082
| Final | 4/10/2008 | 4/11/2008 | 4/11/2008 11:32:45 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Doramus Cassi
|
MEC08-01075
| Rough-in | 4/10/2008 | 4/11/2008 | 4/11/2008 10:33:07 AM | A | FAIL |
|
|
joe Phone #: ###-#### extend flue 18" above upper roof, due to the extreme height the b-vent will need support, provide insulation shield, seal plenum at ceiling
|
MEC08-01073
| Rough-in | 4/10/2008 | 4/11/2008 | 4/11/2008 10:31:36 AM | A | FAIL |
|
|
joe''s hvac Phone #: ###-#### shield b-vent from flex duct, remove screw from b-vent where it is deforming inner liner, screws are not allowed to enter the inner liner of b-vent
|
MEC08-01083
| Final | 4/10/2008 | 4/11/2008 | 4/11/2008 10:01:24 AM | A | PASS |
|
|
PLEASE CALL HOMEOWNER, GARY KWOK, ON WAY OUT AT ###-####. THANKS! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
|
MEC08-00554
| Final | 4/10/2008 | 4/11/2008 | 4/11/2008 9:33:13 AM | A | CANC |
|
|
Final final - Brandon N. Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen final what
|
MEC08-00911
| Rough-in | 4/10/2008 | 4/11/2008 | 4/11/2008 9:26:02 AM | A | PART |
|
|
for 1st floor Phone #: ###-#### Internet Inspection Request from: Robin Cox ok to cover first floor at both offices
|
MEC08-00868
| Final | 4/11/2008 | 4/11/2008 | 4/11/2008 8:51:29 AM | A | PASS |
|
|
|