ESC07-00013
| Complaint Inspection | 4/10/2008 | 4/11/2008 | 4/14/2008 10:07:24 AM | A | FAIL |
|
|
Site has been on hold. Contacted the RP number and he no longer works for the company and The GC has been made aware of the situation and should recieve a call back. CAS #460
|
ESC07-00419
| Random Inspection | 4/10/2008 | 4/11/2008 | 4/11/2008 12:43:23 PM | A | FAIL |
|
|
Site must be stabilized where disurbed soil is not being worked. Will re-inspect on 5/1/08. Need to post ESC sign infront of lot with a RP. CAS #460
|
ESC07-00747
| Random Inspection | 4/10/2008 | 4/11/2008 | 4/11/2008 12:41:32 PM | A | FAIL |
|
|
Site must be stabilized where disurbed soil is not being worked. Will re-inspect on 5/1/08. CAS #460
|
ESC07-00394
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 12:19:29 PM | P | FAIL |
|
|
Notice of Correction To stabilize disturded soil if it set for 30 days or more. Explained to the RP over the situation. Will Re-inspect on 5/11/07 CAS#460
|
ESC07-00394
| Site Preparation | 4/11/2008 | 4/11/2008 | 4/11/2008 12:06:27 PM | P | CANC |
|
|
|
ESC07-00013
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 12:02:25 PM | P | CANC |
|
|
|
ESC07-01170
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 11:53:02 AM | P | FAIL |
|
|
*Notice of Correction* Heavy amounts of sediment in street, sidewalk and gutterpan. Needs to becleaned up. Dirtpile in court needs to be pushed off of sidewalk and protection is needed. Drain Inlet needs protection at the front of project. Will re-inspect on Tuesady in the AM. CAS #460
|
ESC07-01369
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 11:52:22 AM | P | FAIL |
|
|
*Notice of Correction* Heavy amounts of sediment in street, sidewalk and gutterpan. Needs to becleaned up. Dirtpile in court needs to be pushed off of sidewalk and protection is needed. Drain Inlet needs protection at the front of project. Will re-inspect on Tuesady in the AM. CAS #460
|
ESC07-01369
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 11:51:44 AM | P | FAIL |
|
|
*Notice of Correction* Heavy amounts of sediment in street, sidewalk and gutterpan. Needs to becleaned up. Dirtpile in court needs to be pushed off of sidewalk and protection is needed. Drain Inlet needs protection at the front of project. Will re-inspect on Tuesady in the AM. CAS #460
|
ESC07-01276
| BMP Violation | 4/11/2008 | 4/11/2008 | 4/11/2008 11:51:11 AM | P | FAIL |
|
|
*Notice of Correction* Heavy amounts of sediment in street, sidewalk and gutterpan. Needs to becleaned up. Dirtpile in court needs to be pushed off of sidewalk and protection is needed. Drain Inlet needs protection at the front of project. Will re-inspect on Tuesady in the AM. CAS #460
|
ESC07-01277
| Complaint Inspection | 4/11/2008 | 4/11/2008 | 4/11/2008 11:41:36 AM | P | FAIL |
|
|
*Notice of Correction* Heavy amounts of sediment in street, sidewalk and gutterpan. Needs to becleaned up. Dirtpile in court needs to be pushed off of sidewalk and protection is needed. Drain Inlet needs protection at the front of project. Will re-inspect on Tuesady in the AM. CAS #460
|
ESC08-00206
| Complaint Inspection | 4/10/2008 | 4/11/2008 | 4/11/2008 9:29:11 AM | A | PART |
|
|
Cleaning up the areas. Will be protecting The Di when they get ready to wash down the coart area. CAS #460
|